We’re committed to improving our ecosystems, quality of life, and communities for the better.
Our passion and commitment to the integration of innovative science and engineering drive us to exceed on behalf of every client.
The Anchor QEA–Princeton Hydro team was selected by Audubon New York (and its partners Save the Sound and New York State Parks) to design the restoration and enhancement of an approximately 400-acre tidal marsh on the north-central coast of Long Island. The marsh has experienced restricted tidal flow since an earthen berm was breached in 2012 during Superstorm Sandy. The restricted tidal flow led to marsh degradation, which converted portions of the former salt marsh to brackish and freshwater marsh. The lack of tidal flushing also enabled invasive Phragmites australis to establish and spread within the marsh system.
Design goals included:
The Anchor QEA–Princeton Hydro team developed 60% Designs, including design drawings, a cost estimate, a long-term management plan, and a QAPP. The project design includes dredging approximately 15,000 cubic yards of material from Sunken Meadow Creek and thin layer placement of dredged material onto adjacent marsh cells to develop low and high marsh footprints; treating approximately 20 acres of Phragmites australis and phased replanting the areas with native species; creating approximately 2,000 linear feet of channels in the marsh and improving approximately 8,500 linear feet of existing channels to enhance drainage and tidal flushing; creating tidal pools and installing anchored rootwads to promote habitat diversity; modifying existing culverts within the primary flow channel through the marsh; and planting within the high and low salt marsh footprints.
Your Full Name * Phone Number * Your Email * Organization Address Message *
By EmailBy Phone
Submit
Δ
Couldn’t find a match? Check back often as we post new positions throughout the year.