We’re committed to improving our ecosystems, quality of life, and communities for the better.
Our passion and commitment to the integration of innovative science and engineering drive us to exceed on behalf of every client.
Liberty State Park is located on the west bank of Upper New York Bay and is one of the most visited state parks in the nation with over 5.1 million visitors in 2018. Princeton Hydro was contracted to design a resilient coastal ecosystem within 235 acres of this highly urbanized setting that provides both ecological and social benefits. This includes the restoration of over 80 acres of tidal and non-tidal wetlands and creation of several thousands of feet of intertidal shoreline and shallow water habitat hydrologically connected to the Upper New York Bay.
Historically, the site contained intertidal mudflats and shallow water habitat, which were filled and developed as a railroad yard. Once constructed, this project will expand public access, improve water quality, restore native plant communities, and improve coastal resiliency for urban communities that are vulnerable to storm events. The site design includes a trail network for the park interior that will provide access to the newly established habitat zones and views of the Statue of Liberty and New York City skyline. This trail network will enhance pedestrian connectivity between the existing portion of Liberty State Park, Liberty Science Center, Jersey City, and local public transit hubs.
To inform the design development, our team conducted design charrettes with various stakeholders and a myriad of monitoring tasks focused on site characterization including a wetland delineation; bio-benchmarking surveys of the tidal marsh vegetation communities; topographic, bathymetric, and utility surveys; and geotechnical sampling such as SPT borings and test pits. Field data and observations were incorporated into various analyses to support the engineering design including a 2D Hydrologic and Hydraulic model and wave analysis, and a detailed Sea Level Rise Analysis to inform the design of various project elements to accommodate sea level rise projections through 2070. The tidal channel geometry, culvert width, and tidal marsh were designed to address increased flows and water surface elevations. Groundwater levels and flow direction were also characterized through the installation of monitoring wells and continuous measurements of the groundwater level using piezometers.
To support the design process, the team developed interim construction cost estimates for various design milestones and coordinated and advanced the local, state, and federal permit process and applications. As part of NJDEP’s public outreach campaign, our team participated in an open house interacting directly with members of the public. We produced a 4-minute video simulating the expected visitor experience using detailed engineering design renderings. When completed, this will be one of the largest ecosystem habitat restoration projects in New Jersey. Click below to watch the video now:
Your Full Name * Phone Number * Your Email * Organization Address Message *
By EmailBy Phone
Submit
Δ
Couldn’t find a match? Check back often as we post new positions throughout the year.