search
WP_Query Object
(
    [query] => Array
        (
            [category_name] => green-infrastructure
        )

    [query_vars] => Array
        (
            [category_name] => green-infrastructure
            [error] => 
            [m] => 
            [p] => 0
            [post_parent] => 
            [subpost] => 
            [subpost_id] => 
            [attachment] => 
            [attachment_id] => 0
            [name] => 
            [pagename] => 
            [page_id] => 0
            [second] => 
            [minute] => 
            [hour] => 
            [day] => 0
            [monthnum] => 0
            [year] => 0
            [w] => 0
            [tag] => 
            [cat] => 1481
            [tag_id] => 
            [author] => 
            [author_name] => 
            [feed] => 
            [tb] => 
            [paged] => 1
            [meta_key] => 
            [meta_value] => 
            [preview] => 
            [s] => 
            [sentence] => 
            [title] => 
            [fields] => all
            [menu_order] => 
            [embed] => 
            [category__in] => Array
                (
                    [0] => 32
                )

            [category__not_in] => Array
                (
                )

            [category__and] => Array
                (
                )

            [post__in] => Array
                (
                )

            [post__not_in] => Array
                (
                )

            [post_name__in] => Array
                (
                )

            [tag__in] => Array
                (
                )

            [tag__not_in] => Array
                (
                )

            [tag__and] => Array
                (
                )

            [tag_slug__in] => Array
                (
                )

            [tag_slug__and] => Array
                (
                )

            [post_parent__in] => Array
                (
                )

            [post_parent__not_in] => Array
                (
                )

            [author__in] => Array
                (
                )

            [author__not_in] => Array
                (
                )

            [search_columns] => Array
                (
                )

            [ignore_sticky_posts] => 
            [suppress_filters] => 
            [cache_results] => 1
            [update_post_term_cache] => 1
            [update_menu_item_cache] => 
            [lazy_load_term_meta] => 1
            [update_post_meta_cache] => 1
            [post_type] => 
            [posts_per_page] => 10
            [nopaging] => 
            [comments_per_page] => 5
            [no_found_rows] => 
            [order] => DESC
        )

    [tax_query] => WP_Tax_Query Object
        (
            [queries] => Array
                (
                    [0] => Array
                        (
                            [taxonomy] => category
                            [terms] => Array
                                (
                                    [0] => green-infrastructure
                                )

                            [field] => slug
                            [operator] => IN
                            [include_children] => 1
                        )

                    [1] => Array
                        (
                            [taxonomy] => category
                            [terms] => Array
                                (
                                    [0] => 32
                                )

                            [field] => term_id
                            [operator] => IN
                            [include_children] => 
                        )

                )

            [relation] => AND
            [table_aliases:protected] => Array
                (
                    [0] => ph_term_relationships
                    [1] => tt1
                )

            [queried_terms] => Array
                (
                    [category] => Array
                        (
                            [terms] => Array
                                (
                                    [0] => green-infrastructure
                                )

                            [field] => slug
                        )

                )

            [primary_table] => ph_posts
            [primary_id_column] => ID
        )

    [meta_query] => WP_Meta_Query Object
        (
            [queries] => Array
                (
                )

            [relation] => 
            [meta_table] => 
            [meta_id_column] => 
            [primary_table] => 
            [primary_id_column] => 
            [table_aliases:protected] => Array
                (
                )

            [clauses:protected] => Array
                (
                )

            [has_or_relation:protected] => 
        )

    [date_query] => 
    [queried_object] => WP_Term Object
        (
            [term_id] => 1481
            [name] => Green Infrastructure
            [slug] => green-infrastructure
            [term_group] => 0
            [term_taxonomy_id] => 1481
            [taxonomy] => category
            [description] => 
            [parent] => 0
            [count] => 33
            [filter] => raw
            [term_order] => 9
            [cat_ID] => 1481
            [category_count] => 33
            [category_description] => 
            [cat_name] => Green Infrastructure
            [category_nicename] => green-infrastructure
            [category_parent] => 0
        )

    [queried_object_id] => 1481
    [request] => SELECT SQL_CALC_FOUND_ROWS  ph_posts.ID
					 FROM ph_posts  LEFT JOIN ph_term_relationships ON (ph_posts.ID = ph_term_relationships.object_id)  LEFT JOIN ph_term_relationships AS tt1 ON (ph_posts.ID = tt1.object_id)
					 WHERE 1=1  AND ( 
  ph_term_relationships.term_taxonomy_id IN (1481) 
  AND 
  tt1.term_taxonomy_id IN (32)
) AND ((ph_posts.post_type = 'post' AND (ph_posts.post_status = 'publish' OR ph_posts.post_status = 'acf-disabled')))
					 GROUP BY ph_posts.ID
					 ORDER BY ph_posts.menu_order, ph_posts.post_date DESC
					 LIMIT 0, 10
    [posts] => Array
        (
            [0] => WP_Post Object
                (
                    [ID] => 18586
                    [post_author] => 1
                    [post_date] => 2025-11-06 00:15:54
                    [post_date_gmt] => 2025-11-06 00:15:54
                    [post_content] => 

The New Jersey Department of Environmental Protection (NJDEP) recently announced $8 million in Water Quality Restoration Grants to support projects that reduce nonpoint source pollution, mitigate harmful algal blooms, restore riparian areas, and enhance watershed and climate resilience. Funded through Section 319(h) of the federal Clean Water Act and administered by the DEP's Watershed and Land Management Program, these grants were awarded to municipalities, nonprofit organizations, and academic institutions across the state.

Princeton Hydro is proud to be a partner on five of the 17 funded projects. Our contributions vary by project and encompass activities such as engineering design, water quality assessment, watershed-based planning, and technical support for implementing stormwater and habitat restoration measures. Let's take a deeper look at these collaborative efforts:

1. The Watershed Institute – Watershed-Based Planning for Assunpink Creek

The Watershed Institute received $205K in 319(h) grant funding to develop a watershed-based plan for the Assunpink Creek watershed, located within the Raritan River Basin. This watershed spans 11 municipalities across two counties, where varied landscapes and demographics share common challenges such as localized flooding, stormwater management, and water quality degradation, highlighting the need for a coordinated, watershed-wide, science-driven approach.

The plan will evaluate pollution sources and identify large-scale restoration opportunities, including green infrastructure and riparian buffer restoration, to improve water quality and reduce flooding. It will also assess the cost, feasibility, and pollutant reduction potential of proposed measures to ensure practical implementation. Princeton Hydro supported the Institute in developing the grant proposal and planning framework, leveraging our expertise in watershed-based planning to prioritize nature-based solutions that address both water quality and climate resilience. This initiative represents a critical step toward regional collaboration, enabling upstream and downstream communities to work together on strategies that strengthen watershed health, protect public safety, and build long-term resilience.


2. Lake Hopatcong Commission – Watershed-Based Stormwater BMPs

The Lake Hopatcong Commission (LHC) was awarded $366K to retrofit an existing stormwater detention basin between King Road and Mount Arlington Boulevard in Roxbury Township. This retrofit is part of a larger Watershed Implementation Plan that Princeton Hydro developed in collaboration with LHC, which prioritizes nutrient reduction and stormwater management strategies across the Lake Hopatcong watershed. Over the past several years, LHC has actively implemented multiple elements of this plan to address harmful algal blooms (HABs) and improve water quality.

For this project, Princeton Hydro is providing engineering design and technical oversight to transform the existing basin into a green stormwater infrastructure system that slows, captures, and naturally treats runoff before it enters King Cove. The design incorporates native vegetation, invasive species management, and erosion control measures to stabilize soils and filter pollutants, reducing nutrient loading, which is one key driver of HABs. Public outreach and pre- and post-construction water quality monitoring will ensure performance tracking and measurable improvements. This basin retrofit represents a critical step in a coordinated, science-based approach to restoring ecological health and water quality in New Jersey’s largest lake.


3. Cozy Lake, Jefferson Township – Addressing Emerging Contaminants

Jefferson Township received $350K in grant funding to develop an Emerging Contaminants Management Plan for Cozy Lake, focusing on cyanotoxins and HABs. Cozy Lake is a 28-acre waterbody within a 1,152-acre sub-watershed that includes both forested (60%) and developed (29%) land. The lake is fed by the Rockaway River at its northern end and a smaller southeastern inlet, with outflow through a dam on the western edge.

The shoreline is primarily residential lawn with minimal emergent wetlands, and several inlets and rock-lined drainage ditches exhibit erosion and lack slope protection, contributing to sediment loading. Princeton Hydro provided early technical input to shape this innovative project with the creation of a comprehensive Jefferson Township Lake and Watershed Restoration and Protection Plan. As part of the plan, Princeton Hydro made recommendations for Cozy Lake, which included enhancing shoreline buffers with native vegetation and installing living shorelines at select properties to stabilize soils, filter stormwater and reduce nutrient loading, improve habitat quality, and enhance community access. These measures, combined with in-lake monitoring and proactive management strategies, will help mitigate HABs and protect ecological and public health.


4. Rockaway Township – Watershed-Based Green Infrastructure

Rockaway Township received $399K in grant funding to implement elements of its Watershed Implementation Plan, focusing on green infrastructure stormwater management and nutrient reduction to improve water quality. The project will retrofit the municipal complex by converting a rock-lined drainage swale into a vegetated swale with a bioretention basin, designed to filter stormwater runoff and reduce nonpoint source pollutants entering Fox’s Pond and Fox Brook.

Princeton Hydro played a key role in developing the Watershed Implementation Plan, which encompasses 11 private lakes within the Rockaway River watershed, prioritizing critical locations for intervention and designing cost-effective green infrastructure BMPs. This regional approach aligns with strategies recommended by NJDEP and the Highlands Council. The plan included a comprehensive watershed-based assessment to identify and quantify factors contributing to eutrophication, evaluate management measures, estimate costs, and establish an implementation schedule. Princeton Hydro authored the final report, which guided the Township in applying for the Section 319(h) grant and now informs the design and construction of green stormwater infrastructure that will deliver measurable water quality improvements while supporting ecological restoration goals.


5. Green Trust Alliance – Green Infrastructure and Community Engagement

Green Trust Alliance (GTA), a nationally accredited land trust and public charity dedicated to accelerating large-scale conservation, received $1.39 million in NJDEP funding to implement green infrastructure improvements at Pinelands Regional High School in Tuckerton, New Jersey. This initiative targets the Tuckerton Creek watershed, which drains into Tuckerton Creek and ultimately flows into Barnegat Bay—a critical estuary spanning 33 municipalities in Ocean County and four in Monmouth County. The retrofit will transform the school’s stormwater detention basin into a multi-functional system that mimics natural hydrology, enhances flow control, and improves water quality locally and in the larger Barnegat Bay watershed.

Working with GTA and GreenVest, Princeton Hydro is serving as the design engineer, applying nature-based engineering and ecological restoration techniques to intercept, evapotranspire, and infiltrate stormwater runoff at its source. In addition to its technical objectives, the effort includes a strong community engagement component and an educational platform for students. By bringing green infrastructure into the school environment, the initiative provides hands-on experience with water resources, stormwater management, and ecological engineering, help to build STEM skills while fostering a deeper connection to the surrounding landscape and an understanding of how natural systems work together to support environmental and community health.


Princeton Hydro also assisted several of these partners in developing successful NJDEP Section 319(h) grant applications, providing technical documentation, conceptual designs, and pollutant load reduction estimates to strengthen the proposals.

To date, the Murphy Administration has awarded more than $33M in Water Quality Restoration grants to improve the health of waterways in all corners of the state. Click here to read about all the 2025 grant funding recipients and their innovative projects.

As NJDEP Environmental Protection Commissioner Shawn M. LaTourette noted in the department's press release, “Enhancing the ecological health of our lakes, rivers, streams and coastal waters has long been a priority of the Murphy Administration. The Department of Environmental Protection is pleased to award these grants that will help our partners advance a variety of strategies to improve the health of these waterways and enhance the quality of life in our communities.”

We are proud to play a continued role in advancing that mission: helping communities implement practical, data-driven solutions that make a measurable difference for New Jersey’s waterways and the people who depend on them. Click here to learn more about our work to protect natural habitat and restore water quality throughout the New Jersey.

[post_title] => NJDEP Awards $8M for Water Quality Restoration Projects [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => njdep-319h-grants-2025 [to_ping] => [pinged] => [post_modified] => 2025-11-07 01:20:58 [post_modified_gmt] => 2025-11-07 01:20:58 [post_content_filtered] => [post_parent] => 0 [guid] => https://princetonhydro.com/?p=18586 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [1] => WP_Post Object ( [ID] => 17931 [post_author] => 1 [post_date] => 2025-07-22 21:39:22 [post_date_gmt] => 2025-07-22 21:39:22 [post_content] =>

The Steven R. Rothman Overlook and Preserve, a new five-acre public open space in the heart of the Meadowlands, is now open to the public.

Situated within the 587-acre Richard P. Kane Natural Area, the preserve offers an ADA-accessible gateway into one of New Jersey's most ecologically significant landscapes. Visitors can enjoy sweeping views of the Meadowlands and the New York City skyline while immersing themselves in a protected wetland ecosystem that lies along the Atlantic Flyway, a vital route for migratory birds. Owned by the Meadowlands Conservation Trust (MCT) and managed by the New Jersey Sports and Exposition Authority (NJSEA), the site supports a wide range of native and rare wildlife and plant species.

On July 10, local and state leaders gathered to officially dedicate the new preserve and celebrate the extraordinary efforts of former U.S. Congressman Steven R. Rothman, whose leadership was instrumental in preserving the region's critical wetlands. The ceremony brought together Governor Phil Murphy, Congressman Rothman, officials from Bergen County, NY/NJ Baykeeper, Hackensack Riverkeeper, MCT, NJSEA, project partners and community members. The event featured remarks, reflections and a ceremonial tree planting.

[gallery link="none" ids="17871,17868,17870"]

Addressing Congressman Rothman, "We are so proud and happy that this is named after you. You stood up when a lot of others would not. You took a bold stance. You believed in preserving the Meadowlands. We thank you and congratulate you," expressed Greg Remaud, CEO of NY/NJ Baykeeper, at the event.

A century ago, the New Jersey Meadowlands spanned over 21,000 acres of open space. Today, only 8,400 acres remain largely undeveloped. Speakers at the event reflected on the decades-long fight to protect this land, which was once targeted for commercial development, including plans for what would become the American Dream Mall. That 15-year preservation effort ultimately secured the future of this critical habitat.

Governor Murphy emphasized Rothman's role in that success: "Congressman Steven R. Rothman played an oversized role in protecting this incredible expanse of treasured, public open space, and he has been an ardent supporter of the Meadowlands in Congress and as a private citizen. I commend Congressman Rothman’s steadfast determination and that of the Meadowlands Conservation Trust in saving our natural resources."

Congressman Rothman also addressed the crowd, sharing his hope for the future of the site: "This overlook and preserve will now help assure that future generations of New Jerseyans and others will learn about this area's rich natural life and a history of how this space was saved from development.”


About Congressman Rothman

Congressman Rothman represented New Jersey’s 9th Congressional District from 1997 to 2013, serving in the U.S. House of Representatives for 16 years.

For nearly a decade, Congressman Rothman played a pivotal role in the fight to protect what remained of the Hackensack Meadowlands' undeveloped wetlands. At a time when large-scale development threatened the ecological integrity of the region, he brought national attention to the cause, becoming the first U.S. congressional candidate, and later Congressman, to publicly oppose projects like the proposed American Dream Mall. His advocacy helped relocate the development to a more suitable location and catalyzed a broader conservation movement.

Recognizing the ecological significance of the Meadowlands, Congressman Rothman secured $10 million in federal funding, along with additional state and local contributions, to support land acquisition, environmental remediation, and permanent protection of the remaining open space. He brought together key stakeholders, took a firm public stance on what must be preserved, and was instrumental in the formal rezoning of 8,400 acres as undevelopable. Widely acknowledged as the catalyst behind one of New Jersey’s most consequential land preservation efforts, Rothman received multiple regional and national honors for his leadership. The dedication of this new preserve in his name serves as a lasting tribute to his legacy.


Designing a Sustainable, Inclusive Public Space

The project was a design-build collaboration led by SumCo Eco-Contracting, with design services provided by Princeton Hydro, including environmental, civil, and geotechnical engineering; landscape architecture; and construction oversight.

The team approached the project with a deep sense of care and responsibility. “It’s been a privilege to support the vision for this park,” said Cory Speroff, PLA, ASLA, CBLP, Landscape Architect and Project Manager at Princeton Hydro. “From the beginning, we approached the design with a sense of responsibility and sensitivity, knowing how many people have worked tirelessly over the years to protect and preserve the surrounding wetlands. Our goal was to create a space that honors that legacy — a place where people can come to connect with the Meadowlands.”

The newly constructed preserve includes a range of low-impact park features that balance ecological protection with meaningful public access:

  • Permeable parking lot with 10 spaces, including one van-accessible ADA parking spot
  • 10-foot-wide recreational trail that connects key features throughout the site
  • A small gathering space along the trail
  • 2500-square-foot elevated stone overlook, with seating
[gallery link="none" columns="2" ids="17880,17941,17878,17963"]

All elements were designed to be fully ADA-compliant, ensuring inclusive access for visitors of all abilities. The trail and parking surfaces were constructed using a geocellular confinement system, which promotes stormwater infiltration and supports long-term structural integrity. A timber guardrail was added along the drive and parking area to enhance safety and define boundaries.

The photos below show the geoweb material being installed along the trail: [gallery link="none" ids="17958,17957,17956"]

In consideration of the site’s role as critical habitat, particularly for nocturnal and migratory species, artificial lighting was not included in the design.

Ecological restoration was a central focus of the project. The team planted 40 native trees and shrubs, installed a pollinator garden, and seeded the site with native, drought-tolerant grasses to improve habitat value and resilience. These nature-based enhancements not only support biodiversity but also help filter stormwater, stabilize soils, and prepare the landscape for a changing climate.

[gallery link="none" columns="2" ids="17961,17877,17874,17935"]

Plan Your Visit

The preserve, located at the end of Jomike Court in Carlstadt, NJ, is now open daily from dawn to dusk. Visitors are encouraged to explore the trail, take in the sweeping New York City skyline views from the overlook, and appreciate the beauty and ecological richness of the Meadowlands.


Looking for more examples of how design and ecology can come together to benefit both people and nature? Check out our work at South Cape May Meadows Preserve in partnership with The Nature Conservancy in New Jersey. This beloved 200-acre coastal habitat, an international hotspot for birdwatching, draws more than 90,000 visitors annually. Princeton Hydro is helping to restore the preserve’s ecological integrity while improving public access, including recent efforts to remove invasive Phragmites and promote the return of native vegetation. Read more about the project here.

[post_title] => A New Gateway to the Meadowlands: Steven R. Rothman Overlook and Preserve [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => a-new-gateway-to-the-meadowlands-steven-r-rothman-overlook-and-preserve [to_ping] => [pinged] => [post_modified] => 2025-07-22 21:39:22 [post_modified_gmt] => 2025-07-22 21:39:22 [post_content_filtered] => [post_parent] => 0 [guid] => https://princetonhydro.com/?p=17931 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [2] => WP_Post Object ( [ID] => 15090 [post_author] => 1 [post_date] => 2024-06-11 18:25:13 [post_date_gmt] => 2024-06-11 18:25:13 [post_content] =>

By Dr. Fred Lubnow, Senior Technical Director of Ecological Services

As we reflect on the winter of 2023-2024, it's evident that New Jersey experienced another unusually mild season, mirroring the winter of 2022-2023. Notably, Lake Hopatcong, located in Sussex and Morris Counties, remained virtually ice-free throughout the winter, with only a brief period of minor ice formation in early January. This pattern was not isolated to Lake Hopatcong; many lakes across the state and the broader Mid-Atlantic region exhibited similar ice-free conditions. Such conditions can lead to increased algal and plant growth earlier in the year.

Adding to this, from January to early June 2024, 15 of New Jersey's 21 counties recorded precipitation levels 26% to 50% higher than their long-term averages. The remaining six counties, predominantly in the southern part of the state, had precipitation increases of 11% to 25% above their long-term normals. This heightened precipitation is significant as it can transport nutrients, most notably phosphorus and nitrogen, into water bodies, potentially fueling the growth of algae.

Compounding these factors, long-range climate models and trends suggest that the summer of 2024 could rank among the hottest on record. The combination of a mild winter, increased precipitation, and anticipated high summer temperatures sets the stage for conditions similar to those experienced in 2019, a year marked by widespread harmful algal blooms (HABs) in numerous lakes.

HABs, characterized by rapid overgrowths of cyanobacteria, present serious challenges to water quality and aquatic ecosystems. Cyanobacteria, or blue-green algae, naturally occur in aquatic environments but can proliferate rapidly under warm, nutrient-rich conditions. These blooms pose risks to human health, wildlife, aquatic species, local economies, and the overall ecological balance. The interplay between climate change and HABs is undeniable: rising temperatures and altered precipitation patterns foster conditions that exacerbate bloom occurrences.

Given these circumstances, it is crucial for lake managers and water utilities to adopt proactive measures. Early and consistent sampling efforts can detect cyanobacteria and akinetes, dormant spores that contribute to bloom formation. Additionally, reducing nutrient inputs, particularly phosphorus, into waterways is essential to prevent HABs. Princeton Hydro strongly recommends that lake managers, water utilities, and concerned community members closely monitor their lakes, reservoirs, and riverways to stay as proactive as possible in managing these valuable resources.

By raising awareness, fostering collaboration, and implementing effective strategies, we can work towards safeguarding the health and sustainability of our freshwater ecosystems. Together, we can address the challenges posed by HABs and protect the integrity of our water bodies. For more information about HABs, click here.


Dr. Fred Lubnow, Princeton Hydro’s Senior Technical Director, Ecological Services, is an expert in aquatic and watershed management, restoration ecology, community and ecosystem ecology, and the use of benthic macroinvertebrate and fish in-stream bioassessment protocols. Dr. Lubnow has managed hundreds of lake projects and provides technical expertise for a variety of lake and watershed restoration projects.

His experience in lake and reservoir restoration includes the design and implementation of dredging, aeration, chemical control of nuisance species, nutrient inactivation (i.e. alum) and biomanipulation. His experience in watershed restoration includes the design and implementation of structural Best Management Practices (BMPs), the development of Total Maximum Daily Load (TMDL) pollutant budgets, and the design, implementation and analysis of watershed-based monitoring programs.

[post_title] => Preparing for Potential Harmful Algal Blooms: An Urgent Call to Action for NJ's Lakes and Reservoirs [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => an-urgent-call-to-action-habs [to_ping] => [pinged] => [post_modified] => 2024-06-11 18:25:13 [post_modified_gmt] => 2024-06-11 18:25:13 [post_content_filtered] => [post_parent] => 0 [guid] => https://princetonhydro.com/?p=15090 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) ) [post_count] => 3 [current_post] => -1 [before_loop] => 1 [in_the_loop] => [post] => WP_Post Object ( [ID] => 18586 [post_author] => 1 [post_date] => 2025-11-06 00:15:54 [post_date_gmt] => 2025-11-06 00:15:54 [post_content] =>

The New Jersey Department of Environmental Protection (NJDEP) recently announced $8 million in Water Quality Restoration Grants to support projects that reduce nonpoint source pollution, mitigate harmful algal blooms, restore riparian areas, and enhance watershed and climate resilience. Funded through Section 319(h) of the federal Clean Water Act and administered by the DEP's Watershed and Land Management Program, these grants were awarded to municipalities, nonprofit organizations, and academic institutions across the state.

Princeton Hydro is proud to be a partner on five of the 17 funded projects. Our contributions vary by project and encompass activities such as engineering design, water quality assessment, watershed-based planning, and technical support for implementing stormwater and habitat restoration measures. Let's take a deeper look at these collaborative efforts:

1. The Watershed Institute – Watershed-Based Planning for Assunpink Creek

The Watershed Institute received $205K in 319(h) grant funding to develop a watershed-based plan for the Assunpink Creek watershed, located within the Raritan River Basin. This watershed spans 11 municipalities across two counties, where varied landscapes and demographics share common challenges such as localized flooding, stormwater management, and water quality degradation, highlighting the need for a coordinated, watershed-wide, science-driven approach.

The plan will evaluate pollution sources and identify large-scale restoration opportunities, including green infrastructure and riparian buffer restoration, to improve water quality and reduce flooding. It will also assess the cost, feasibility, and pollutant reduction potential of proposed measures to ensure practical implementation. Princeton Hydro supported the Institute in developing the grant proposal and planning framework, leveraging our expertise in watershed-based planning to prioritize nature-based solutions that address both water quality and climate resilience. This initiative represents a critical step toward regional collaboration, enabling upstream and downstream communities to work together on strategies that strengthen watershed health, protect public safety, and build long-term resilience.


2. Lake Hopatcong Commission – Watershed-Based Stormwater BMPs

The Lake Hopatcong Commission (LHC) was awarded $366K to retrofit an existing stormwater detention basin between King Road and Mount Arlington Boulevard in Roxbury Township. This retrofit is part of a larger Watershed Implementation Plan that Princeton Hydro developed in collaboration with LHC, which prioritizes nutrient reduction and stormwater management strategies across the Lake Hopatcong watershed. Over the past several years, LHC has actively implemented multiple elements of this plan to address harmful algal blooms (HABs) and improve water quality.

For this project, Princeton Hydro is providing engineering design and technical oversight to transform the existing basin into a green stormwater infrastructure system that slows, captures, and naturally treats runoff before it enters King Cove. The design incorporates native vegetation, invasive species management, and erosion control measures to stabilize soils and filter pollutants, reducing nutrient loading, which is one key driver of HABs. Public outreach and pre- and post-construction water quality monitoring will ensure performance tracking and measurable improvements. This basin retrofit represents a critical step in a coordinated, science-based approach to restoring ecological health and water quality in New Jersey’s largest lake.


3. Cozy Lake, Jefferson Township – Addressing Emerging Contaminants

Jefferson Township received $350K in grant funding to develop an Emerging Contaminants Management Plan for Cozy Lake, focusing on cyanotoxins and HABs. Cozy Lake is a 28-acre waterbody within a 1,152-acre sub-watershed that includes both forested (60%) and developed (29%) land. The lake is fed by the Rockaway River at its northern end and a smaller southeastern inlet, with outflow through a dam on the western edge.

The shoreline is primarily residential lawn with minimal emergent wetlands, and several inlets and rock-lined drainage ditches exhibit erosion and lack slope protection, contributing to sediment loading. Princeton Hydro provided early technical input to shape this innovative project with the creation of a comprehensive Jefferson Township Lake and Watershed Restoration and Protection Plan. As part of the plan, Princeton Hydro made recommendations for Cozy Lake, which included enhancing shoreline buffers with native vegetation and installing living shorelines at select properties to stabilize soils, filter stormwater and reduce nutrient loading, improve habitat quality, and enhance community access. These measures, combined with in-lake monitoring and proactive management strategies, will help mitigate HABs and protect ecological and public health.


4. Rockaway Township – Watershed-Based Green Infrastructure

Rockaway Township received $399K in grant funding to implement elements of its Watershed Implementation Plan, focusing on green infrastructure stormwater management and nutrient reduction to improve water quality. The project will retrofit the municipal complex by converting a rock-lined drainage swale into a vegetated swale with a bioretention basin, designed to filter stormwater runoff and reduce nonpoint source pollutants entering Fox’s Pond and Fox Brook.

Princeton Hydro played a key role in developing the Watershed Implementation Plan, which encompasses 11 private lakes within the Rockaway River watershed, prioritizing critical locations for intervention and designing cost-effective green infrastructure BMPs. This regional approach aligns with strategies recommended by NJDEP and the Highlands Council. The plan included a comprehensive watershed-based assessment to identify and quantify factors contributing to eutrophication, evaluate management measures, estimate costs, and establish an implementation schedule. Princeton Hydro authored the final report, which guided the Township in applying for the Section 319(h) grant and now informs the design and construction of green stormwater infrastructure that will deliver measurable water quality improvements while supporting ecological restoration goals.


5. Green Trust Alliance – Green Infrastructure and Community Engagement

Green Trust Alliance (GTA), a nationally accredited land trust and public charity dedicated to accelerating large-scale conservation, received $1.39 million in NJDEP funding to implement green infrastructure improvements at Pinelands Regional High School in Tuckerton, New Jersey. This initiative targets the Tuckerton Creek watershed, which drains into Tuckerton Creek and ultimately flows into Barnegat Bay—a critical estuary spanning 33 municipalities in Ocean County and four in Monmouth County. The retrofit will transform the school’s stormwater detention basin into a multi-functional system that mimics natural hydrology, enhances flow control, and improves water quality locally and in the larger Barnegat Bay watershed.

Working with GTA and GreenVest, Princeton Hydro is serving as the design engineer, applying nature-based engineering and ecological restoration techniques to intercept, evapotranspire, and infiltrate stormwater runoff at its source. In addition to its technical objectives, the effort includes a strong community engagement component and an educational platform for students. By bringing green infrastructure into the school environment, the initiative provides hands-on experience with water resources, stormwater management, and ecological engineering, help to build STEM skills while fostering a deeper connection to the surrounding landscape and an understanding of how natural systems work together to support environmental and community health.


Princeton Hydro also assisted several of these partners in developing successful NJDEP Section 319(h) grant applications, providing technical documentation, conceptual designs, and pollutant load reduction estimates to strengthen the proposals.

To date, the Murphy Administration has awarded more than $33M in Water Quality Restoration grants to improve the health of waterways in all corners of the state. Click here to read about all the 2025 grant funding recipients and their innovative projects.

As NJDEP Environmental Protection Commissioner Shawn M. LaTourette noted in the department's press release, “Enhancing the ecological health of our lakes, rivers, streams and coastal waters has long been a priority of the Murphy Administration. The Department of Environmental Protection is pleased to award these grants that will help our partners advance a variety of strategies to improve the health of these waterways and enhance the quality of life in our communities.”

We are proud to play a continued role in advancing that mission: helping communities implement practical, data-driven solutions that make a measurable difference for New Jersey’s waterways and the people who depend on them. Click here to learn more about our work to protect natural habitat and restore water quality throughout the New Jersey.

[post_title] => NJDEP Awards $8M for Water Quality Restoration Projects [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => njdep-319h-grants-2025 [to_ping] => [pinged] => [post_modified] => 2025-11-07 01:20:58 [post_modified_gmt] => 2025-11-07 01:20:58 [post_content_filtered] => [post_parent] => 0 [guid] => https://princetonhydro.com/?p=18586 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [comment_count] => 0 [current_comment] => -1 [found_posts] => 3 [max_num_pages] => 1 [max_num_comment_pages] => 0 [is_single] => [is_preview] => [is_page] => [is_archive] => 1 [is_date] => [is_year] => [is_month] => [is_day] => [is_time] => [is_author] => [is_category] => 1 [is_tag] => [is_tax] => [is_search] => [is_feed] => [is_comment_feed] => [is_trackback] => [is_home] => [is_privacy_policy] => [is_404] => [is_embed] => [is_paged] => [is_admin] => [is_attachment] => [is_singular] => [is_robots] => [is_favicon] => [is_posts_page] => [is_post_type_archive] => [query_vars_hash:WP_Query:private] => 2e1bab915a5267bd6f50a02e31af00a2 [query_vars_changed:WP_Query:private] => 1 [thumbnails_cached] => [allow_query_attachment_by_filename:protected] => [stopwords:WP_Query:private] => [compat_fields:WP_Query:private] => Array ( [0] => query_vars_hash [1] => query_vars_changed ) [compat_methods:WP_Query:private] => Array ( [0] => init_query_flags [1] => parse_tax_query ) [query_cache_key:WP_Query:private] => wp_query:d208d33242c67b24a7946059fc0c8148 )

Category: Green Infrastructure

archive
 
Topics
Select Topics