search
WP_Query Object
(
    [query] => Array
        (
            [tag] => musconetcong-river
        )

    [query_vars] => Array
        (
            [tag] => musconetcong-river
            [error] => 
            [m] => 
            [p] => 0
            [post_parent] => 
            [subpost] => 
            [subpost_id] => 
            [attachment] => 
            [attachment_id] => 0
            [name] => 
            [pagename] => 
            [page_id] => 0
            [second] => 
            [minute] => 
            [hour] => 
            [day] => 0
            [monthnum] => 0
            [year] => 0
            [w] => 0
            [category_name] => stream_restoration
            [cat] => 41
            [tag_id] => 723
            [author] => 
            [author_name] => 
            [feed] => 
            [tb] => 
            [paged] => 1
            [meta_key] => 
            [meta_value] => 
            [preview] => 
            [s] => 
            [sentence] => 
            [title] => 
            [fields] => all
            [menu_order] => 
            [embed] => 
            [category__in] => Array
                (
                    [0] => 41
                )

            [category__not_in] => Array
                (
                )

            [category__and] => Array
                (
                )

            [post__in] => Array
                (
                )

            [post__not_in] => Array
                (
                )

            [post_name__in] => Array
                (
                )

            [tag__in] => Array
                (
                )

            [tag__not_in] => Array
                (
                )

            [tag__and] => Array
                (
                )

            [tag_slug__in] => Array
                (
                    [0] => musconetcong-river
                )

            [tag_slug__and] => Array
                (
                )

            [post_parent__in] => Array
                (
                )

            [post_parent__not_in] => Array
                (
                )

            [author__in] => Array
                (
                )

            [author__not_in] => Array
                (
                )

            [search_columns] => Array
                (
                )

            [ignore_sticky_posts] => 
            [suppress_filters] => 
            [cache_results] => 1
            [update_post_term_cache] => 1
            [update_menu_item_cache] => 
            [lazy_load_term_meta] => 1
            [update_post_meta_cache] => 1
            [post_type] => 
            [posts_per_page] => 10
            [nopaging] => 
            [comments_per_page] => 5
            [no_found_rows] => 
            [order] => DESC
        )

    [tax_query] => WP_Tax_Query Object
        (
            [queries] => Array
                (
                    [0] => Array
                        (
                            [taxonomy] => category
                            [terms] => Array
                                (
                                    [0] => 41
                                )

                            [field] => term_id
                            [operator] => IN
                            [include_children] => 
                        )

                    [1] => Array
                        (
                            [taxonomy] => post_tag
                            [terms] => Array
                                (
                                    [0] => musconetcong-river
                                )

                            [field] => slug
                            [operator] => IN
                            [include_children] => 1
                        )

                )

            [relation] => AND
            [table_aliases:protected] => Array
                (
                    [0] => ph_term_relationships
                    [1] => tt1
                )

            [queried_terms] => Array
                (
                    [category] => Array
                        (
                            [terms] => Array
                                (
                                    [0] => 41
                                )

                            [field] => term_id
                        )

                    [post_tag] => Array
                        (
                            [terms] => Array
                                (
                                    [0] => musconetcong-river
                                )

                            [field] => slug
                        )

                )

            [primary_table] => ph_posts
            [primary_id_column] => ID
        )

    [meta_query] => WP_Meta_Query Object
        (
            [queries] => Array
                (
                )

            [relation] => 
            [meta_table] => 
            [meta_id_column] => 
            [primary_table] => 
            [primary_id_column] => 
            [table_aliases:protected] => Array
                (
                )

            [clauses:protected] => Array
                (
                )

            [has_or_relation:protected] => 
        )

    [date_query] => 
    [queried_object] => WP_Term Object
        (
            [term_id] => 723
            [name] => musconetcong river
            [slug] => musconetcong-river
            [term_group] => 0
            [term_taxonomy_id] => 723
            [taxonomy] => post_tag
            [description] => 
            [parent] => 0
            [count] => 14
            [filter] => raw
            [term_order] => 0
        )

    [queried_object_id] => 723
    [request] => SELECT SQL_CALC_FOUND_ROWS  ph_posts.ID
					 FROM ph_posts  LEFT JOIN ph_term_relationships ON (ph_posts.ID = ph_term_relationships.object_id)  LEFT JOIN ph_term_relationships AS tt1 ON (ph_posts.ID = tt1.object_id)
					 WHERE 1=1  AND ( 
  ph_term_relationships.term_taxonomy_id IN (41) 
  AND 
  tt1.term_taxonomy_id IN (723)
) AND ((ph_posts.post_type = 'post' AND (ph_posts.post_status = 'publish' OR ph_posts.post_status = 'acf-disabled')))
					 GROUP BY ph_posts.ID
					 ORDER BY ph_posts.menu_order, ph_posts.post_date DESC
					 LIMIT 0, 10
    [posts] => Array
        (
            [0] => WP_Post Object
                (
                    [ID] => 13963
                    [post_author] => 1
                    [post_date] => 2023-11-27 12:03:16
                    [post_date_gmt] => 2023-11-27 12:03:16
                    [post_content] => 

The removal of Beatty's Mill Dam stands as a pivotal moment in the conservation efforts along the Musconetcong River. This critical initiative, spearheaded by the Musconetcong Watershed Association (MWA), Washington Township, and the Town of Hackettstown in collaboration with Princeton Hydro and RiverLogic Solutions, marks a significant stride towards rejuvenating the river's natural ecosystem and addressing long-standing concerns regarding flood mitigation and habitat preservation.

[caption id="attachment_13929" align="aligncenter" width="763"] Photo taken November 12, 2023.[/caption]

History of the Beatty’s Mill Dam

Beatty's Mill Dam straddles the border between Warren and Morris Counties in Hackettstown and Washington Township, New Jersey.  It is a 6-foot-high stone masonry, concrete, and earth embankment dam that was built in the 18th century and has been non-functional for decades.

[caption id="attachment_13968" align="alignright" width="419"] Photo of Beatty's Mill Dam (pre-removal) taken from upstream with the East Avenue bridge in the background[/caption]

Beatty’s Mill Dam is a low-head dam, which means it was not built to protect communities from flooding and can make flooding worse in some cases. Hackettstown and Washington Township are also more susceptible to flooding and erosion due to the high percentage of impervious surfaces, like roads and parking lots, which cause higher flows of stormwater runoff.

A dam safety report from 1981 shows that the dam had been breached on the eastern end. The breach caused a hairpin turn where the river is diverted sharply to the east then back to the west before flowing under the East Avenue bridge. Over time, this created erosive conditions at the upstream side of the bridge and roadbed, threatening the integrity of the infrastructure. Additionally, extensive alteration of the floodplain occurred upstream of the dam, including an elevated earthen berm along the left bank, and general land disturbance in both upland and wetlands.

The removal of the dam not only addresses the structural concerns but also holds the promise of extensive environmental improvements. By eradicating barriers to the Musconetcong River's natural flow, restoring the floodplain, and implementing strategies to curb stormwater runoff, this initiative aims to mitigate flooding, promote water quality, and foster a thriving habitat for aquatic organisms including indigenous species like the Eastern Brook Trout and American Eel.


Removing the Dam

With funding from the Highlands Council, Princeton Hydro was contracted in 2019 by Washington Township to complete a water quality assessment, hydrologic and hydraulic analysis, and functional value stream assessment of reaches of the Musconetcong River that encompassed the Beatty’s Mill site (and the downstream Newburgh Dam site). Following the New Jersey Highlands Water Protection and Planning Council guidance, Princeton Hydro assessed and rated the river reaches on five functional values: channel integrity, habitat, water quality, temperature moderation, and public use. The Beatty’s Mill Dam, floodplain encroachment, narrow riparian buffers, and non-native riparian vegetation were the primary sources of impact to the functional values.

Subsequently, Princeton Hydro was contracted by MWA to complete a site investigation, wetland delineation, topographic survey, and preliminary (60%) engineering design for dam removal. Preliminary plans were reviewed by Washington Township and the Town of Hackettstown. In 2023, Princeton Hydro completed the final engineering design, hydrologic and hydraulic modeling, and permitting for the removal of Beatty’s Mill Dam and restoration of the floodplain and provided engineering oversight during construction.

[gallery link="none" columns="2" ids="13938,13939"]  

The removal of Beatty’s Mill Dam was officially completed the week of November 13, 2023!

Princeton Hydro assisted in the removal and restoration, providing engineering plans and project management support. With the dam removed, 2.5 acres of flood plain have been restored; 0.15 mile of stream bank have been stabilized; 0.15 mile of stream bed has been rehabilitated; and total suspended solids in the water have been reduced by 20%.

Michael Allers, Princeton Hydro Restoration Ecologist and licensed FAA-Certified Commercial Drone Pilot, captured these aerial images of the completed project site:

[gallery link="none" columns="4" ids="13934,13933,13932,13931"]

It is projected that there will be significant improvement to the five aforementioned functional values, increased fish passage, enhanced hydraulic conditions at the East Avenue bridge as well as improvements to the river’s pH, temperature, and dissolved oxygen levels.

Removing the dam also supports conformance with the Highlands Regional Master Plan, which is intended to protect, preserve, and enhance precious water resources within the Highlands Region. The project work also includes the restoration of the damaged floodplain, stream banks, and stream bed by planting trees, building up the banks with rocks, and allowing the river to return to its natural flowing channel.


Looking Ahead

This project’s significance extends beyond the immediate environmental impact. Funding from sources like the National Fish and Wildlife Foundation under the Delaware Watershed Conservation Fund and New Jersey’s Highlands Council, along with corporate contributions, underscores its potential to serve as a model for similar restoration projects across the Delaware River Watershed. Such initiatives not only enhance aquatic habitats but also bolster community resilience against flooding and elevate public awareness regarding watershed conservation.

The vision for this restoration effort reflects a collective commitment to revitalize river ecosystems, not just for the immediate region but as part of a broader strategy for conservation. The Beatty's Mill Dam marks the MWA's sixth dam removed on the Musconetcong River since 2008, but it is far from the last. This project aims to set a precedent for sustainable river management and ecosystem preservation.

The removal of Beatty's Mill Dam represents a milestone in the ongoing efforts to restore the Musconetcong River's ecological balance and underscores the collaborative spirit between MWA, local municipalities, various stakeholders, and Princeton Hydro. It serves as a testament to the potential of concerted conservation endeavors to restore the vitality of our waterways and safeguard the natural heritage for generations to come.


The Musconetcong Watershed Association (MWA) is an independent, nonprofit organization dedicated to protecting and improving the quality of the Musconetcong River and its watershed, including its natural and cultural resources. Members of the organization are part of a network of individuals, families, and companies that care about the Musconetcong River and its watershed, and are dedicated to improving the watershed resources through public education and awareness programs, river water quality monitoring, promotion of sustainable land management practices, and community involvement. Click here to learn more.

Princeton Hydro has been working with MWA in the areas of river restoration, dam removal, and engineering consulting since 2003. Click here to read our Client Spotlight blog featuring MWA’s Executive Director Cindy Joerger and Communications Coordinator Karen Doerfer.

[post_title] => Conservation Spotlight: Beatty's Mill Dam Removal is Complete [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => beattys-mill-dam-removal [to_ping] => [pinged] => [post_modified] => 2025-05-14 21:37:11 [post_modified_gmt] => 2025-05-14 21:37:11 [post_content_filtered] => [post_parent] => 0 [guid] => https://princetonhydro.com/?p=13963 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 2 [filter] => raw ) [1] => WP_Post Object ( [ID] => 11893 [post_author] => 1 [post_date] => 2022-11-22 17:32:43 [post_date_gmt] => 2022-11-22 17:32:43 [post_content] =>

This month, we’re celebrating the sixth anniversary of the Hughesville Dam Removal. The removal of the 18-foot-high, 150-foot-long dam not only marked a major milestone in restoring the Musconetcong River, it also led to the speedy return of the American shad (Alosa sapidissima), a species that had been absent from the area for 200+ years.

 

Project Background

The Hughesville Dam was constructed by John L. Riegel and the Warren Manufacturing Company in the late-1800s to provide water to power the former paper mill located in Hughesville. The dam, a 12-foot-high timber crib and rock fill dam, spanned the Musconetcong River from Holland Township, Hunterdon County to Pohatcong Township, Warren County. The structure was not in compliance with NJDEP Dam Safety Standards and was creating a blockage to catadromous and local fish passage.

Musconetcong Watershed Association hired Princeton Hydro to investigate, design, permit, and oversee the decommissioning of the Hughesville Dam, and conduct related river restoration work within the Musconetcong River. The Hughesville Dam was the fifth dam on the Musconetcong River designed for removal by Princeton Hydro.

As part of the dam removal project, Princeton Hydro completed a feasibility study in 2012 and initiated designs in 2014 to decommission the spillway and restore the impoundment. To assess potential sediment impacts, vibracoring was conducted and sediment analysis and quantification of the volume of impounded material was completed. Princeton Hydro worked with the NJDEP to assess the quality of sediment and determine its ultimate disposal.

[gallery columns="2" link="file" ids="1046,11896"]

As part of the design, the 21,000 cubic yards was proposed to be hydraulically dredged to adjacent existing on-site lagoons at this now defunct paper mill plant. The pre-existing and proposed hydraulics were assessed to understand impacts to an upstream bridge and downstream flood water surfaces following removal. Geomorphic assessments and utilization of nature-based restoration techniques were utilized to design a new river channel within the former impoundment.

Following the completion of design, applications were prepared for submission to NJDEP’s Land Use Regulation Program and Dam Safety Section, as well as the Hunterdon County Soil Conservation District (Warren County ceded jurisdiction to Hunterdon County). Princeton Hydro also applied for right-of-way permits to reinforce the foundation of an upstream county bridge as well as construct project access from a county road. Following the receipt of permits, Princeton Hydro assisted in the procurement of a contractor and provided construction administration services.

 

Bringing Down the Dam

On Thursday, Sept 8 2016, the project team made the first notches in the Dam. Sally Jewell, Secretary of the Interior during that time, toured the project site and held a press conference to commemorate the initial dam breach and celebrate the exciting news. Jewell called the project a “model for collaborative conservation.”

[caption id="attachment_5512" align="aligncenter" width="536"]Dam removal project partners and community members pose with Sally Jewell at the Hughesville Dam removal event on Sept. 8, 2016. Photo Credit: USFWS. Dam removal project partners and community members pose with Sally Jewell at the Hughesville Dam removal event on Sept. 8, 2016. Photo Credit: USFWS.[/caption]  

In addition to the Honorable Sally Jewell, NJDEP Commissioner Bob Martin, and U.S. Army Corp of Engineers, Philadelphia District Commander Lt. Colonel Michael Bliss, also participated in the press conference to discuss the importance of the Hughesville Dam removal and dam removal in general.

The entire dam removal took nearly three months, but you can watch the sped-up version here:

The project was supported by many partners and funded largely by the USFWS through the Department of the Interior (DOI) under the Hurricane Sandy Disaster Relief Appropriations Act of 2013.

 

Conservation Success

The removal of the obsolete Hughesville Dam marked another major milestone of restoring the Musconetcong River. The removal is part of a larger partner-based effort led by the Musconetcong Watershed Association to restore the 42-mile Musconetcong - a designated “Wild and Scenic River” – to a free-flowing state.

[caption id="attachment_11894" align="aligncenter" width="672"] Photos by Musconetcong Watershed Association[/caption]  

Removing the dam opened nearly six miles of the Musconetcong to migratory fish, such as American shad, that spend much of their lives in the ocean but return to rivers and their tributaries to spawn. The removal was completed in November 2016 and in the Spring of 2017, schools of American shad were observed above the dam, after 200+ years of absence. Shad are a benchmark species indicative of the overall ecological health and diversity of the waterway.

Other benefits of the dam removal include eliminating a public hazard due to the deteriorating nature of the dam; restoring the natural of floodplain functions and values of the area; restoring native stream substrate and habitat; and increasing river fishing and recreation opportunities.

To read more about the Musconetcong Watershed Association, click here. To read about another dam removal project along the Musconetcong River, click here. [post_title] => Celebrating the 6th Anniversary of Hughesville Dam Removal [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => celebrating-the-6th-anniversary-of-hughesville-dam-removal [to_ping] => [pinged] => [post_modified] => 2022-11-30 23:45:11 [post_modified_gmt] => 2022-11-30 23:45:11 [post_content_filtered] => [post_parent] => 0 [guid] => https://princetonhydro.com/?p=11893 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [2] => WP_Post Object ( [ID] => 2525 [post_author] => 3 [post_date] => 2018-08-30 14:15:58 [post_date_gmt] => 2018-08-30 14:15:58 [post_content] =>

To celebrate the 50th Anniversary of the Wild and Scenic Rivers Act, the Musconetcong Watershed Association (MWA) is hosting the “Wild & Scenic Film Festival On Tour”. The festival is free and open to the public, but seating is limited so, registration is required. The festival will be held on Sunday, September 9th from 10 am to 2 pm at Centenary University in Hackettstown, NJ.

To bring communities together around local and global environmental issues, The "Wild & Scenic Film Festival" goes "on-tour" partnering with nonprofit organizations and local groups to screen films year-round with hopes of inspiring individuals to take environmental action. The tour stops in 170 communities around the globe, features over 150 award-winning films, and welcomes over 100 guest speakers, celebrities, and activists who bring a human face to the environmental movement.

Credit: NPS.gov

The Hackettstown, NJ tour event will feature 11 short films including River Connections, which celebrates the 50th anniversary of the Federal Wild and Scenic Rivers Act, under which the Musconetcong River is protected. The film explores the importance of free-flowing rivers and highlights the recent Hughesville Dam removal project. An interactive panel event will follow the film screening and feature experts including MWA Executive Director Alan Hunt, Ph.D. and Princeton Hydro President Geoffrey Goll, P.E., who were both interviewed in the film.

"Our multidisciplinary approach to dam removal using ecology and engineering, paired with a dynamic stakeholder partnership, led to a successful river restoration, where native fish populations returned within a year," said Princeton Hydro's President Geoffrey Goll, P.E. "We are grateful for MWA's hard work in organizing this film festival so we can continue to share our dam removal success stories and the importance of the Wild and Scenic Rivers Act."

Princeton Hydro, a proud sponsor of the "Wild & Scenic Film Festival On Tour," has worked with MWA to design five dam removals on the Musconetcong River, including the Hughesville Dam. As noted in the River Connections film, the Hughesville Dam was a major milestone in restoring migratory fish passage along the Musconetcong. Only a year after the completion of the dam removal, American shad were documented as having returned to the "Musky" for the first time in 250 years.

The tour leads up to the annual 5-day film festival, which will be held January 17-21, 2019 in Nevada City and Grass Valley, California. Sponsored by National Park Service, the Wild & Scenic Film Festival honors the Wild and Scenic Rivers Act, landmark legislation passed by Congress in October 1968 that safeguards the free-flowing character of rivers by precluding them from being dammed, while allowing the public to enjoy them. It encourages river management and promotes public participation in protecting streams.

EVENT DETAILS:

Date:         Sunday, September 9th Time:         Doors open at 10 am and shows start at 11 am Location:  Centenary University, Sitnik Theatre,                   400 Jefferson St, Hackettstown, NJ 07840 Tickets:     FREE! Please register in advance:                    https://goo.gl/NrwcgE  

Interested to learn more about River Connections? Check out our blog celebrating the release of the film: 

[embed]https://www.princetonhydro.com/blog/wild-and-scenic-rivers/[/embed]
[post_title] => Wild & Scenic Film Festival is Coming to Hackettstown [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => wild-scenic-film-festival [to_ping] => [pinged] => [post_modified] => 2025-05-26 10:13:20 [post_modified_gmt] => 2025-05-26 10:13:20 [post_content_filtered] => [post_parent] => 0 [guid] => https://www.princetonhydro.com/blog/?p=2525 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [3] => WP_Post Object ( [ID] => 1751 [post_author] => 3 [post_date] => 2018-04-20 22:47:26 [post_date_gmt] => 2018-04-20 22:47:26 [post_content] =>

The Musconetcong Watershed Association (MWA) held its 26th Annual Musconetcong River Cleanup on April 14. Volunteers conducted cleanup efforts at various locations all along the Musconetcong River from its start at Lake Hopatcong down to where it meets the Delaware River. Princeton Hydro, a proud sponsor of the event, has investigated, designed and permitted five dam removals along the Musconetcong River.

Princeton Hydro led a volunteer team near the Warren Glen Dam site and former Hughesville Dam site. The team picked-up garbage along the road and riverbank, and pulled trash from the riverbed. In 2016, we designed and oversaw the Hughesville Dam removal and streambank restoration project, which enabled the return of American shad to the river for the first time in decades.

"We enjoyed the beautiful, warm, and sunny Saturday morning bonding with our Princeton Hydro colleagues and friends, while giving back to the Musconetcong Watershed Association," said Geoffery Goll, President of Princeton Hydro. "Our successful partnership with MWA on multiple dam removals in critical locations has expedited the restoration and protection of the Musconetcong River."

[gallery size="medium" link="none" ids="1761,1757,1758,1752,1756,1753,1759,1755,1754"]

MWA hosts cleanups throughout the year. If you have an idea for a volunteer cleanup day, please email info@musconetcong.org.

[post_title] => Musconetcong River Volunteer Cleanup [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => musconetcong-cleanup [to_ping] => [pinged] => [post_modified] => 2024-12-10 12:36:49 [post_modified_gmt] => 2024-12-10 12:36:49 [post_content_filtered] => [post_parent] => 0 [guid] => https://www.princetonhydro.com/blog/?p=1751 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [4] => WP_Post Object ( [ID] => 1511 [post_author] => 3 [post_date] => 2018-02-23 16:53:28 [post_date_gmt] => 2018-02-23 16:53:28 [post_content] => Credit: NPS.gov Communities across the nation are preparing to celebrate the 50th anniversary of the Wild and Scenic Rivers Act. This landmark legislation passed by Congress in October 1968 safeguards the free-flowing character of rivers by precluding them from being dammed, while allowing the public to enjoy them. It encourages river management and promotes public participation in protecting streams. As part of the celebration, the National Park Service released a new video highlighting a handful of ‘Wild and Scenic’ designated rivers in the Northeast – the Farmington, Sudbury, Assabet, Concord, and Musconetcong Rivers – along with the organizations and community volunteers who work together to protect and care for these rivers. Princeton Hydro is proud to work with two of the river stewards featured in the video: Musconetcong Watershed Association and Farmington River Watershed Association.

The Musconetcong River:

Designated ‘Wild and Scenic’ in 2006, the Musconetcong River is a 45.7-mile-long tributary of the Delaware River in northwestern New Jersey. Princeton Hydro has been working with MWA in the areas of river restoration, dam removal, and engineering consulting since 2003 when the efforts to remove the Gruendyke Mill Dam in Hackettstown, NJ began. To date, Princeton Hydro has worked with MWA to remove five dams on the Musconetcong River, the most recent being the Hughesville Dam. As noted in the video, the removal of these dams, especially the Hughesville dam, was a major milestone in restoring migratory fish passage along the Musconetcong. Only a year after the completion of the dam removal, American shad returned to the "Musky" for the first time in 250 years. “The direction the river is moving bodes well for its recovery,” said Princeton Hydro President Geoff Goll, P.E., who was interviewed in the 50th anniversary video. “This multidisciplinary approach using ecology and engineering, paired with a dynamic stakeholder partnership, lead to a successful river restoration, where native fish populations returned within a year. ”

The Farmington River:

The Upper Farmington River, designated as ‘Wild and Scenic' in 1994, stretches 14-miles through Connecticut starting above Riverton through the New Hardford/Canton town line. The river is important for outdoor recreation and provides critical habitat for countless wildlife. Credit: FWRA.orgBack in 2012, Princeton Hydro worked with the Farmington River Watershed Association and its project partners to remove the Spoonville Dam. Built in 1899 on the site of a natural 25-foot drop in the riverbed, the dam was originally a hydropower facility. The hurricanes and flood of 1955 breached the dam, opening a 45-foot gap and scattering massive dam fragments in the riverbed downstream. The remnant of the main dam persisted for decades as a 128-foot long, 25-foot high obstacle in the channel. The river poured through the breach in a steep chute that stopped American shad from proceeding further upstream to spawn. The project was completed, from initial site investigation through engineering assessment and final design, in just six months. The dam removal helped to restore historic fish migrations in the Farmington River (including the American shad) and increase recreation opportunities.

Wild & Scenic Rivers Act:

Credit: NPS.govAs of December 2014 (the last designation), the National 'Wild and Scenic' System protects 12,734 miles of 208 rivers in 40 states and the Commonwealth of Puerto Rico; this is a little more than one-quarter of 1% of the nation's rivers. By comparison, more than 75,000 large dams across the country have modified at least 600,000 miles, or about 17%, of American rivers. In honor of the 50th anniversary of the Act and in an effort to designate many more miles of river as ‘Wild and Scenic,’ four federal agencies and four nonprofit groups are coordinating nationwide events and outreach. Managing agencies are the Bureau of Land Management, Fish and Wildlife ServiceForest Service, and National Park Service, along with American RiversAmerican WhitewaterRiver Network and River Management Society. Go here for more info: www.wildandscenicrivers50.us.
To learn more about our work to restore and preserve the Musconetcong River and its watershed, click here. [post_title] => New Video Celebrates 50th Anniversary of Wild & Scenic Rivers Act [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => wild-and-scenic-rivers [to_ping] => [pinged] => [post_modified] => 2025-05-26 10:13:29 [post_modified_gmt] => 2025-05-26 10:13:29 [post_content_filtered] => [post_parent] => 0 [guid] => https://www.princetonhydro.com/blog/?p=1511 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 2 [filter] => raw ) [5] => WP_Post Object ( [ID] => 1351 [post_author] => 3 [post_date] => 2017-12-18 15:28:59 [post_date_gmt] => 2017-12-18 15:28:59 [post_content] => Musconetcong Watershed Association (MWA) held a dinner to celebrate its 25th anniversary as well as the 150th anniversary of the Asbury Grist Mill, which the MWA is working to restore. The evening included a cocktail hour, a buffet dinner, silent auction, remarks by the MWA President Tish Lascelle and Executive Director Alan Hunt, and a presentation of awards. The MWA presented Princeton Hydro President Geoff Goll, PE with the "Friend of the River" Award. This award, which has only been given seven times in MWA’s 25 years of service, recognizes individuals who have made a significant and sustainable difference in the Watershed and helped to advance its mission. Recipients of the Award have also demonstrated outstanding leadership through their volunteer efforts or partnerships with MWA. Geoff was honored to receive the award alongside Paul Kenney of the National Park Service and Richard C. Cotton, a Managing Partner of the Hawk Pointe Golf Club and Asbury Farms Real Estate. Paul was assigned the Musconetcong River in late 2003 and was instrumental in obtaining the Musconetcong River's Wild and Scenic Designation in 2006. He has continued to be an excellent resource of the National Park Service.  Richard is a founding member of the MWA's Board of Trustee's and continues to serve on the Board. He has dedicated his professional life to striking a balance between economic growth with environmental protection. Geoff has been working with MWA in the areas of river restoration, dam removal, and engineering consulting since 2003, when the efforts to remove the Gruendyke Mill Dam in Hackettstown, NJ began. He has since worked with the Princeton Hydro team to remove five dams on the Musconetcong River, the most recent being the Hughesville Dam MWA is an independent, non-profit organization dedicated to protecting and improving the quality of the Musconetcong River and its Watershed, including its natural and cultural resources. Members of the organization are part of a network of individuals, families and companies that care about the Musconetcong River and its watershed, and are dedicated to improving the watershed resources through public education and awareness programs, river water quality monitoring, promotion of sustainable land management practices and community involvement. During the anniversary dinner, participants also got a sneak peek of a new video from the National Park Service that is set for public release in 2018. The video celebrates the upcoming 50th anniversary of the Federal Wild and Scenic Rivers Act, under which the Musconetcong River is protected, and explores the importance of free-flowing rivers and why Americans treasure them. Representing Princeton Hydro at the awards dinner were Vice President Mark Gallagher, his wife Jennifer, Geoff and his wife Amy, and Director of Engineering Services Mary Paist-Goldman, PE. [gallery link="none" ids="1365,1367,1370"]                          

...

[post_title] => Musconetcong Watershed Association Presents Princeton Hydro President with Prestigious "Friend of the River" Award [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => friend-of-the-river-award [to_ping] => [pinged] => [post_modified] => 2025-05-26 10:13:15 [post_modified_gmt] => 2025-05-26 10:13:15 [post_content_filtered] => [post_parent] => 0 [guid] => https://www.princetonhydro.com/blog/?p=1351 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [6] => WP_Post Object ( [ID] => 1137 [post_author] => 3 [post_date] => 2017-06-21 21:02:18 [post_date_gmt] => 2017-06-21 21:02:18 [post_content] =>
After a 250+ year absence, American shad have returned to the Musconetcong River in Hunterdon and Warren counties. This milestone in the ecological recovery of the river is the result of the removal of dams on the lower Musconetcong several years ago, followed by the removal of the Hughesville Dam in Warren County last year. Removing the dams opened nearly six miles of the Musconetcong to migratory fish, such as American shad, that spend much of their lives in the ocean but return to rivers and their tributaries to spawn. The shad's return is a good sign of the overall ecological health and diversity of the river. Princeton Hydro was proud to partner with the Musconetcong Watershed Association and so many other incredible organizations who came together on the Hughesville Dam Removal project. To date, Princeton Hydro has investigated, designed and permitted five dam removals on the Musconetcong. The next Musconetcong dam targeted for removal is the 32-foot high Warren Glen Dam, less than a mile farther upstream. It is the largest dam in the river; by comparison, the Hughesville Dam was 15-feet tall. Princeton Hydro President Geoff Goll, P.E. published this commentary piece titled, "The Return of the American Shad to the Musconetcong River:"
Update (June 15, 2017) - NJDEP issued press release on the finding of American shad on the Musky. Bob Shin, NJDEP Commissioner, stated, “[t]he return of shad, a benchmark species indicative of the overall ecological health and diversity of a waterway, is an exciting milestone.... This achievement is the direct result of an ongoing partnership among state and federal agencies, nonprofit groups, and dam owners – all committed to making this beautiful waterway free-flowing again.On June 7, 2017, Princeton Hydro celebrated along with the Musconetcong Watershed Association (and an excellent story of the MWA, human history of the river, and the efforts to preserve the history and ecology can be found here) and other project partners, the discovery of American shad on the Musconetcong River in NJ, over 250 years after they were blocked from this major tributary of the Delaware River - On September 8, 2016, then Secretary of the Interior, Sally Jewell, held a press conference to celebrate the initial breach of the Hughesville Dam on the Musconetcong River (time lapse of removal is here). The press conference was held as the Department of the Interior via of the US Fish and Wildlife Service provided the funding to remove this obsolete structure through their Hurricane Sandy Recovery funding and the Natural Resource Damage Assessment and Restoration program. In addition to the Honorable Sally Jewell, NJDEP Commissioner Bob Martin, and US Army Corp of Engineers, Philadelphia District Commander Lt. Colonel Michael Bliss, were also on hand to speak about the importance of the Hughesville Dam removal and dam removal in general. To have such dignitaries at the highest levels of our Federal and State government speak at a project our firm designed was truly an honor and privilege. It was a great day to celebrate the next obsolete dam on the Musconetcong River to fall to the progress of river restoration. However, this would pale in comparison to the news we received on Wednesday, June 7, 2017, when the NJ Division of Fish and Wildlife confirmed the presence of the American shad (Alosa sapidissima) above the Hughesville Dam! Ms. Patricia Hamilton, Fisheries Biologist of NJ Fish And Wildlife, reported that they "spotted small schools of American Shad (at most 6 at a time) and captured 4 several hundred yards downstream of the Warren Glen Dam", five miles from the confluence of the Delaware River. This is the first documentation of American shad on this river in over 250 years! So, what is the big deal you may ask. The American shad is the Mid-Atlantic and Southeastern United States' salmon; it is actually a clupeid, a forage type fish closely related to herrings and sardines. Like herrings and sardines, they are a very oily fish, high in omega-3 fats, and low in contamination. It is also a fairly large clupeid, reaching three to eight pounds as adults. Like the salmon, American shad are anadromous, meaning they live the major part of their lives in the ocean and spawn up the coasts' rivers. The American shad is not a spectacularly looking fish to say the least, and in fact, looks like a "generic" illustration of a fish, unlike the sleek and sexy salmon. It doesn't even jump. However, this fish is a long distance and endurance swimmer, who's migration from its hatching in rivers of the East Coast to its primary habitat in the Atlantic Ocean up in the Gulf of Maine, makes it one of the Earth's great travelers. It can swim nearly 20,000 kilometers in its first five years of life and can dive to depths of up to 375 meters. And like all of its clupeid kindred, it is both a key prey species for many large fish and cetaceans in the Atlantic's pelagic zone (open ocean) and an important commercial fish. But it is the existence of over-fishing, pollution and dams that had brought this species to its knees in many of the major eastern US rivers. While the Delaware River shad and herring species have rebounded somewhat from low populations in the mid-1900s with the advent of the US Clean Water Act, they continue to struggle to regain their numbers, and in fact, there is now a moratorium on catching river herring in the Delaware River, and NJ has a moratorium on the harvesting of shad and herring on its tributaries to the Delaware River and Atlantic Ocean. As far as tributary access is concerned, the largest tributaries to the Delaware, the Schuylkill and Lehigh Rivers, are still blocked by dams to their mouths with very little efficiency of fish ladders provided; with their dams having very little success in gaining support for the removal of their blockages. So, any gains in additional spawning habitat for such anadromous species is viewed as a significant victory. The opening of the Musconetcong River to migrating fish will be a large contributor to the rebound of American shad, and other river herring species. As one of the original 13 colonies, NJ was an integral partner in the start of the United States and early industrial revolution. It has been documented through our research during the dam removal regulatory permit application process on this waterway that the Musconetcong River has been dammed just about all the way to its confluence with the Delaware River since the mid-1700s, and likely much earlier. So, before there was anyone who understood the importance of unimpeded rivers for fish migration, this particular route was cut-off in its entirety, and then remained so for well over 250 years. So, it is understandable that there was no reason to assume that anadromous fish, such as shad, would resume the use of the river in a short period of time; however, there existed the right habitat for them, should they be afforded access...and the hope of the partners working on this river. There were doubters, to be sure, but "lo and behold", we now know these mighty fish took advantage of an opening almost immediately. Now, I am not stating that American shad immediately realized that the Hughesville Dam was gone and took a B-line from the Delaware River to the highest unimpeded location. First, other dams downstream of the Hughesville Dam had been removed over the past several years. These dams included the Finesville Dam (for an excellent video of the story of this dam removal, check out this video by the US Fish and Wildlife Service), removed in 2011 and the Reigelsville Dam remnants (there were two additional remnants found when the first foundation was removed) soon after the Finesville Dam was removed. So, it is likely that American Shad had started moving up the river to the base of the Hughesville Dam between 2011 and 2016. Still the response by American shad is nothing short of spectacular. For the over 250 years this species has not been able to use this river, at all, and now, within a span less than six years of dam removal activities, this fish is raring to comeback and, hopefully, spawn and increase their numbers. And the efforts are not nearly complete for the Musconetcong River. The finding of the American shad five miles upstream from the Delaware River shows that this river can and, now, does support this fish. This generic looking fish, yet awesome product of evolution should only fuel the fire of continued restoration efforts, proof-positive that the labor and funds spent here, in this river, gets results. Such funds and labor (an staggering amount of time, blood, sweat, and tears) are required in order to get the river restoration work done. These projects have received the majority of their backing from the federal government, through grant programs, natural resource damage funds, and direct Congressional authorized funds. Without support from Washington, D.C.,, and Trenton, none of this work would be possible. And to get these funds, required work by the many team partners to prepare applications, meet with federal agencies, and educate the public through open and transparent meetings and communication. This was an impressive effort by the residents of this watershed, professionals who provided their expertise, and the state and federal employees who have dedicated their lives to this kind of work. The Musconetcong River, with its recovering ecosystem, and its human and non-human inhabitants continue to amaze me in how we should all strive to strike balance between man and nature; and all this is being accomplished in the most densely populated state in the nation. The finding of American shad gives me reason to cheer, and is why I do what I do. This is it, the return of a species that at one time we had no assurance would return, has returned. This is hope for us, after all.
Read more about Princeton Hydro's river restoration and dam/barrier services on our website. Please contact us anytime if you have a project you'd like to discuss.

[post_title] => The Return of the American Shad to the Musconetcong River [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => musconetcong-dam-removal [to_ping] => [pinged] => [post_modified] => 2025-03-28 16:12:57 [post_modified_gmt] => 2025-03-28 16:12:57 [post_content_filtered] => [post_parent] => 0 [guid] => https://www.princetonhydro.com/blog/?p=1137 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) [7] => WP_Post Object ( [ID] => 953 [post_author] => 3 [post_date] => 2016-12-19 18:35:05 [post_date_gmt] => 2016-12-19 18:35:05 [post_content] => As dams age, the danger to life and property around them increases. If they were to suddenly fail and flood downstream communities and infrastructure, there would be serious loss of property and life. More and more, dam removal has become the best option for property owners who no longer want or can no longer afford the rising cost of maintenance and repair work required to maintain such a complex structure. The Courier-Post recently published this Commentary piece titled, "The Plight of Aging Dams, and One Solution", which was written by Princeton Hydro's Vice President and Principal Engineer Geoffrey M. Goll:
Many of our nation’s dams, while originally intended to provide benefits for mills, water supply and energy generation, are severely aged and unmaintained. Nearly 20,000 of the dams on the Army Corps of Engineers’ National Inventory of Dams – which doesn’t even include many dams that are not inventoried or known about – were built in the 1960s. With expected lifespans of 50 years, these dams have reached their limit. And by 2020, 70 percent of all dams will be over 50 years old. Like roads and bridges, dams also require upkeep, maintenance and eventually removal or rehabilitation. As dams age, the danger to life and property around them increases. If they were to suddenly fail and flood downstream communities and infrastructure, there would be loss of property and life. The Association of State Dam Safety Officials, the professional organization for dam safety engineering professionals and regulators, estimates there would need to be a $21 billion investment to repair just 2,000 deficient, high-hazard dams. More and more, the removal of dams has become an option for owners who no longer want or no longer can afford the rising cost of maintenance and repair work required to maintain such a complex structure. For dams like this, removal benefits local economies, and eliminates threats to people and property in local communities. There are also many byproduct benefits, including restoring fish migration routes, improving water quality, restoring floodplain functions and values, and increasing biodiversity. On Sept. 8, we had the honor of meeting the Secretary of the Interior Sally Jewell during a visit of our Hughesville Dam removal project on the Musconetcong River, located in northwestern New Jersey. This project exemplifies the successes that can be achieved through public-private partnerships, including local communities, state and federal agencies, nongovernmental organizations, and private commercial entities. This is the fifth dam removed on the Musconetcong River by a coalition of stakeholders, led by the Musconetcong Watershed Association. The Department of the Interior (specifically, the U.S. Fish and Wildlife Service) provided funding to remove this very old, out-of-compliance dam. The success of these partnerships is due to the unique strengths that each organization brings to the table. This project achieved the removal of a flood and safety hazard, and will restore additional river miles for migratory fish, improve water quality by removing the heat sink of the reservoir, and provide additional safe passage for recreation along the river. It is easy to see why Secretary Jewell chose this site to visit, but the old and outdated dam at Hughesville is far from alone. Across the nation, we need to remove dams like this at a much larger scale – aging dams that no longer are of value to us, but increase the danger to those who live downstream. If we can build on this momentum and start to address the issue of dam safety compliance on a national scale, we can address these threats to American’s safety and strengthen local economies.
[post_title] => The Plight of Aging Dams, and One Solution [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => the-plight-of-aging-dams-and-one-solution [to_ping] => [pinged] => [post_modified] => 2024-12-10 12:36:54 [post_modified_gmt] => 2024-12-10 12:36:54 [post_content_filtered] => [post_parent] => 0 [guid] => https://www.princetonhydro.com/blog/?p=953 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) ) [post_count] => 8 [current_post] => -1 [before_loop] => 1 [in_the_loop] => [post] => WP_Post Object ( [ID] => 13963 [post_author] => 1 [post_date] => 2023-11-27 12:03:16 [post_date_gmt] => 2023-11-27 12:03:16 [post_content] =>

The removal of Beatty's Mill Dam stands as a pivotal moment in the conservation efforts along the Musconetcong River. This critical initiative, spearheaded by the Musconetcong Watershed Association (MWA), Washington Township, and the Town of Hackettstown in collaboration with Princeton Hydro and RiverLogic Solutions, marks a significant stride towards rejuvenating the river's natural ecosystem and addressing long-standing concerns regarding flood mitigation and habitat preservation.

[caption id="attachment_13929" align="aligncenter" width="763"] Photo taken November 12, 2023.[/caption]

History of the Beatty’s Mill Dam

Beatty's Mill Dam straddles the border between Warren and Morris Counties in Hackettstown and Washington Township, New Jersey.  It is a 6-foot-high stone masonry, concrete, and earth embankment dam that was built in the 18th century and has been non-functional for decades.

[caption id="attachment_13968" align="alignright" width="419"] Photo of Beatty's Mill Dam (pre-removal) taken from upstream with the East Avenue bridge in the background[/caption]

Beatty’s Mill Dam is a low-head dam, which means it was not built to protect communities from flooding and can make flooding worse in some cases. Hackettstown and Washington Township are also more susceptible to flooding and erosion due to the high percentage of impervious surfaces, like roads and parking lots, which cause higher flows of stormwater runoff.

A dam safety report from 1981 shows that the dam had been breached on the eastern end. The breach caused a hairpin turn where the river is diverted sharply to the east then back to the west before flowing under the East Avenue bridge. Over time, this created erosive conditions at the upstream side of the bridge and roadbed, threatening the integrity of the infrastructure. Additionally, extensive alteration of the floodplain occurred upstream of the dam, including an elevated earthen berm along the left bank, and general land disturbance in both upland and wetlands.

The removal of the dam not only addresses the structural concerns but also holds the promise of extensive environmental improvements. By eradicating barriers to the Musconetcong River's natural flow, restoring the floodplain, and implementing strategies to curb stormwater runoff, this initiative aims to mitigate flooding, promote water quality, and foster a thriving habitat for aquatic organisms including indigenous species like the Eastern Brook Trout and American Eel.


Removing the Dam

With funding from the Highlands Council, Princeton Hydro was contracted in 2019 by Washington Township to complete a water quality assessment, hydrologic and hydraulic analysis, and functional value stream assessment of reaches of the Musconetcong River that encompassed the Beatty’s Mill site (and the downstream Newburgh Dam site). Following the New Jersey Highlands Water Protection and Planning Council guidance, Princeton Hydro assessed and rated the river reaches on five functional values: channel integrity, habitat, water quality, temperature moderation, and public use. The Beatty’s Mill Dam, floodplain encroachment, narrow riparian buffers, and non-native riparian vegetation were the primary sources of impact to the functional values.

Subsequently, Princeton Hydro was contracted by MWA to complete a site investigation, wetland delineation, topographic survey, and preliminary (60%) engineering design for dam removal. Preliminary plans were reviewed by Washington Township and the Town of Hackettstown. In 2023, Princeton Hydro completed the final engineering design, hydrologic and hydraulic modeling, and permitting for the removal of Beatty’s Mill Dam and restoration of the floodplain and provided engineering oversight during construction.

[gallery link="none" columns="2" ids="13938,13939"]  

The removal of Beatty’s Mill Dam was officially completed the week of November 13, 2023!

Princeton Hydro assisted in the removal and restoration, providing engineering plans and project management support. With the dam removed, 2.5 acres of flood plain have been restored; 0.15 mile of stream bank have been stabilized; 0.15 mile of stream bed has been rehabilitated; and total suspended solids in the water have been reduced by 20%.

Michael Allers, Princeton Hydro Restoration Ecologist and licensed FAA-Certified Commercial Drone Pilot, captured these aerial images of the completed project site:

[gallery link="none" columns="4" ids="13934,13933,13932,13931"]

It is projected that there will be significant improvement to the five aforementioned functional values, increased fish passage, enhanced hydraulic conditions at the East Avenue bridge as well as improvements to the river’s pH, temperature, and dissolved oxygen levels.

Removing the dam also supports conformance with the Highlands Regional Master Plan, which is intended to protect, preserve, and enhance precious water resources within the Highlands Region. The project work also includes the restoration of the damaged floodplain, stream banks, and stream bed by planting trees, building up the banks with rocks, and allowing the river to return to its natural flowing channel.


Looking Ahead

This project’s significance extends beyond the immediate environmental impact. Funding from sources like the National Fish and Wildlife Foundation under the Delaware Watershed Conservation Fund and New Jersey’s Highlands Council, along with corporate contributions, underscores its potential to serve as a model for similar restoration projects across the Delaware River Watershed. Such initiatives not only enhance aquatic habitats but also bolster community resilience against flooding and elevate public awareness regarding watershed conservation.

The vision for this restoration effort reflects a collective commitment to revitalize river ecosystems, not just for the immediate region but as part of a broader strategy for conservation. The Beatty's Mill Dam marks the MWA's sixth dam removed on the Musconetcong River since 2008, but it is far from the last. This project aims to set a precedent for sustainable river management and ecosystem preservation.

The removal of Beatty's Mill Dam represents a milestone in the ongoing efforts to restore the Musconetcong River's ecological balance and underscores the collaborative spirit between MWA, local municipalities, various stakeholders, and Princeton Hydro. It serves as a testament to the potential of concerted conservation endeavors to restore the vitality of our waterways and safeguard the natural heritage for generations to come.


The Musconetcong Watershed Association (MWA) is an independent, nonprofit organization dedicated to protecting and improving the quality of the Musconetcong River and its watershed, including its natural and cultural resources. Members of the organization are part of a network of individuals, families, and companies that care about the Musconetcong River and its watershed, and are dedicated to improving the watershed resources through public education and awareness programs, river water quality monitoring, promotion of sustainable land management practices, and community involvement. Click here to learn more.

Princeton Hydro has been working with MWA in the areas of river restoration, dam removal, and engineering consulting since 2003. Click here to read our Client Spotlight blog featuring MWA’s Executive Director Cindy Joerger and Communications Coordinator Karen Doerfer.

[post_title] => Conservation Spotlight: Beatty's Mill Dam Removal is Complete [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => beattys-mill-dam-removal [to_ping] => [pinged] => [post_modified] => 2025-05-14 21:37:11 [post_modified_gmt] => 2025-05-14 21:37:11 [post_content_filtered] => [post_parent] => 0 [guid] => https://princetonhydro.com/?p=13963 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 2 [filter] => raw ) [comment_count] => 0 [current_comment] => -1 [found_posts] => 8 [max_num_pages] => 1 [max_num_comment_pages] => 0 [is_single] => [is_preview] => [is_page] => [is_archive] => 1 [is_date] => [is_year] => [is_month] => [is_day] => [is_time] => [is_author] => [is_category] => [is_tag] => 1 [is_tax] => [is_search] => [is_feed] => [is_comment_feed] => [is_trackback] => [is_home] => [is_privacy_policy] => [is_404] => [is_embed] => [is_paged] => [is_admin] => [is_attachment] => [is_singular] => [is_robots] => [is_favicon] => [is_posts_page] => [is_post_type_archive] => [query_vars_hash:WP_Query:private] => f61214de210b39349553eb4153b959bc [query_vars_changed:WP_Query:private] => 1 [thumbnails_cached] => [allow_query_attachment_by_filename:protected] => [stopwords:WP_Query:private] => [compat_fields:WP_Query:private] => Array ( [0] => query_vars_hash [1] => query_vars_changed ) [compat_methods:WP_Query:private] => Array ( [0] => init_query_flags [1] => parse_tax_query ) [query_cache_key:WP_Query:private] => wp_query:7e8e18212f5376b573ab82c869a3d5a1:0.53437500 17588455120.85108300 1758845512 )

Tag: musconetcong river

archive
 
Topics
Select Topics
Posted on November 27, 2023

Conservation Spotlight: Beatty’s Mill Dam Removal is Complete

Popular Topics

Company News

Engineering

Environmental Action

Environmental Services

Flood Mitigation

Invasive Species Management

Lake and Pond Management

Natural Resource Management

Stormwater Management

Stream Restoration