We’re committed to improving our ecosystems, quality of life, and communities for the better.
Our passion and commitment to the integration of innovative science and engineering drive us to exceed on behalf of every client.
400 native plants were installed along the western shoreline of Memorial Pond in Mount Arlington, New Jersey. The planting was completed in one day by a team of 20+ volunteers, staff members from Mt. Arlington Department of Public Works (DPW), Lake Hopatcong Foundation, Lake Hopatcong Commission, Princeton Hydro, and a generous community member who volunteered his excavating equipment (and time).
The planting initiative aims to prevent shoreline erosion, promote the growth of native species, increase wildlife habitat, and improve the water quality of Memorial Pond and Lake Hopatcong. Funding for this project was secured through a grant from the New Jersey Department of Environmental Protection, awarded to the Lake Hopatcong Commission in partnership with the Lake Hopatcong Foundation.
Memorial Pond is a 0.3-acre stormwater runoff basin that gradually releases into Glen Brook, which then flows into Lake Hopatcong. The pond receives sheet flow of stormwater from the adjacent road, which contributes to nutrient and sediment loading, thus locally reducing water quality in Memorial Pond and ultimately the waters of Lake Hopatcong.
Memorial Park, which includes Memorial Pond and Glen Brook, was identified by Princeton Hydro and the Lake Hopatcong team as a priority site for improvement, targeting initiatives that reduce pollutants and excessive nutrients entering into Lake Hopatcong.
Additionally, the pond’s steeply-sloped shoreline was bare and only stabilized with large rocks at the base of the banks. In the absence of stabilizing vegetation, the pond’s banks were experiencing erosion, and there was some concern about a few mature trees along the shoreline potentially falling into the pond.
The photos above were taken in April 2023 before the planting initiative.
The plant selection and layout were designed taking into account the steep slope and presence of mature, existing trees as well as focusing on regionally native plant species that will thrive and help stabilize the eroding shoreline. The planting team, led by Princeton Hydro Landscape Architect Jamie Feinstein, RLA and Aquatics Project Manager Pat Rose, was given precise instructions on how to install the plants to eliminate washouts and ensure the root systems can embrace the soil and hold it in place.
A variety of native herbaceous plants and shrubs were chosen for the site, including pennsylvania sedge, slender mountain mint, blue flag iris, sweet azalea, smooth hydrangea, and maple-leaved viburnum.
The plants will help reduce stormwater flow, absorb excess nutrients, prevent erosion, and ultimately decrease sedimentation to the pond, while creating a visually pleasing addition to the park and providing a habitat for pollinators and birds. Overall, this project promotes a healthier and more balanced ecosystem in Memorial Park.
The photos above were taken in July 2023 immediately after the planting initiative.
The installation of these beneficial plants is part of a series of water quality initiatives on Lake Hopatcong funded by a NJDEP Freshwater Harmful Algal Bloom (HAB) Prevention & Management Grant and 319(h) Grant awarded to Lake Hopatcong Commission in partnership with the Lake Hopatcong Foundation.
Additional initiatives included in the watershed implementation and HABs management plan are, the installation of:
floating wetland island (FWI), which are a low-cost, effective green infrastructure solution designed to mimic natural wetlands in a sustainable, efficient, and powerful way. FWIs improve water quality by assimilating and removing excess nutrients; provide valuable ecological habitat for a variety of beneficial species; help mitigate wave and wind erosion impacts; provide an aesthetic element; and add significant biodiversity enhancement within open freshwater environments;
biochar filtration bags, which improve water quality by removing phosphorus from waterbodies. Biochar can be placed in floatation balls, cages, or sacks, which are then tethered along the shoreline and in critical locations throughout the waterbody; and
nanobubble aeration system, which increases the concentrations of dissolved oxygen in the water, prevents stagnation of water, increases circulation, disrupts thermal stratification which provides “through-column” mixing, and minimizes the occurrence of HABs.
“Paired with biochar filters attached to buoys in the pond and continued monitoring and maintenance of the plantings by the DPW, these steps will set a healthy precedent for what can be achieved through working together with funders, local partners, science, and landscape architecture,” said Feinstein, who sourced plant material, provided logistics and co-led the planning and volunteer planting event along with Rose.
Princeton Hydro’s Landscape Architect, Cory Speroff PLA, ASLA, CBLP, designed the planting plan, and Will Kelleher and Jackson Tilves from the Aquatics Team participated in the plant installation event with Feinstein.
Princeton Hydro is also authoring and supplying a maintenance manual that provides guidance on seasonal care of the plantings, when to remove the herbivory protection fencing, pruning, watering, and other activities that support the long term success of the planting initiative.
“This collaborative effort to enhance water quality serves as a prime example of how seemingly simple actions can have a meaningful impact on safeguarding our water resources for the benefit of future generations,” said the Lake Hopatcong Foundation.
The photos above from left to right: June 2023 before the planting; July 2023 during the planting (photo by Lake Hopatcong Foundation Executive Director Kyle Richter); and July 2023 immediately after the planting.
Princeton Hydro has been working on Lake Hopatcong, New Jersey’s largest Lake, for 30+ years, restoring the lake, managing the watershed, reducing pollutant loading, and addressing invasive aquatic plants and nuisance algal blooms. To read about some of the other projects we’ve recently worked on at Lake Hopatcong, click here.
add comment
Δ
Your Full Name * Phone Number * Your Email * Organization Address Message *
By EmailBy Phone
Submit
Couldn’t find a match? Check back often as we post new positions throughout the year.