We’re committed to improving our ecosystems, quality of life, and communities for the better.
Our passion and commitment to the integration of innovative science and engineering drive us to exceed on behalf of every client.
WP_Query Object ( [query] => Array ( [tag] => environmental-science ) [query_vars] => Array ( [tag] => environmental-science [error] => [m] => [p] => 0 [post_parent] => [subpost] => [subpost_id] => [attachment] => [attachment_id] => 0 [name] => [pagename] => [page_id] => 0 [second] => [minute] => [hour] => [day] => 0 [monthnum] => 0 [year] => 0 [w] => 0 [category_name] => flood-mitigation [cat] => 35 [tag_id] => 388 [author] => [author_name] => [feed] => [tb] => [paged] => 1 [meta_key] => [meta_value] => [preview] => [s] => [sentence] => [title] => [fields] => all [menu_order] => [embed] => [category__in] => Array ( [0] => 35 ) [category__not_in] => Array ( ) [category__and] => Array ( ) [post__in] => Array ( ) [post__not_in] => Array ( ) [post_name__in] => Array ( ) [tag__in] => Array ( ) [tag__not_in] => Array ( ) [tag__and] => Array ( ) [tag_slug__in] => Array ( [0] => environmental-science ) [tag_slug__and] => Array ( ) [post_parent__in] => Array ( ) [post_parent__not_in] => Array ( ) [author__in] => Array ( ) [author__not_in] => Array ( ) [search_columns] => Array ( ) [ignore_sticky_posts] => [suppress_filters] => [cache_results] => 1 [update_post_term_cache] => 1 [update_menu_item_cache] => [lazy_load_term_meta] => 1 [update_post_meta_cache] => 1 [post_type] => [posts_per_page] => 10 [nopaging] => [comments_per_page] => 5 [no_found_rows] => [order] => DESC ) [tax_query] => WP_Tax_Query Object ( [queries] => Array ( [0] => Array ( [taxonomy] => category [terms] => Array ( [0] => 35 ) [field] => term_id [operator] => IN [include_children] => ) [1] => Array ( [taxonomy] => post_tag [terms] => Array ( [0] => environmental-science ) [field] => slug [operator] => IN [include_children] => 1 ) ) [relation] => AND [table_aliases:protected] => Array ( [0] => ph_term_relationships [1] => tt1 ) [queried_terms] => Array ( [category] => Array ( [terms] => Array ( [0] => 35 ) [field] => term_id ) [post_tag] => Array ( [terms] => Array ( [0] => environmental-science ) [field] => slug ) ) [primary_table] => ph_posts [primary_id_column] => ID ) [meta_query] => WP_Meta_Query Object ( [queries] => Array ( ) [relation] => [meta_table] => [meta_id_column] => [primary_table] => [primary_id_column] => [table_aliases:protected] => Array ( ) [clauses:protected] => Array ( ) [has_or_relation:protected] => ) [date_query] => [queried_object] => WP_Term Object ( [term_id] => 388 [name] => environmental science [slug] => environmental-science [term_group] => 0 [term_taxonomy_id] => 388 [taxonomy] => post_tag [description] => [parent] => 0 [count] => 117 [filter] => raw [term_order] => 0 ) [queried_object_id] => 388 [request] => SELECT SQL_CALC_FOUND_ROWS ph_posts.ID FROM ph_posts LEFT JOIN ph_term_relationships ON (ph_posts.ID = ph_term_relationships.object_id) LEFT JOIN ph_term_relationships AS tt1 ON (ph_posts.ID = tt1.object_id) WHERE 1=1 AND ( ph_term_relationships.term_taxonomy_id IN (35) AND tt1.term_taxonomy_id IN (388) ) AND ((ph_posts.post_type = 'post' AND (ph_posts.post_status = 'publish' OR ph_posts.post_status = 'acf-disabled'))) GROUP BY ph_posts.ID ORDER BY ph_posts.menu_order, ph_posts.post_date DESC LIMIT 0, 10 [posts] => Array ( [0] => WP_Post Object ( [ID] => 5431 [post_author] => 3 [post_date] => 2020-10-27 10:27:13 [post_date_gmt] => 2020-10-27 10:27:13 [post_content] => The Dunes at Shoal Harbor, a coastal residential community in Monmouth County, New Jersey, is situated adjacent to both the Raritan Bay and the New York City Ferry channel. In July 2018, Princeton Hydro was contracted to restore this coastal community that was severely impacted by Hurricane Sandy. Today, we are thrilled to report that the shoreline protection design plans have been fully constructed and the project is complete.
The Dunes at Shoal Harbor, a coastal residential community in Monmouth County, New Jersey, is situated adjacent to both the Raritan Bay and the New York City Ferry channel. In July 2018, Princeton Hydro was contracted to restore this coastal community that was severely impacted by Hurricane Sandy. Today, we are thrilled to report that the shoreline protection design plans have been fully constructed and the project is complete.
In order to protect the coastal community from flooding, a revetment had been constructed on the property many years ago. The revetment, however, was significantly undersized and completely failed during Hurricane Sandy. The community was subjected to direct wave attack and flooding, homes were damaged, beach access was impaired, and the existing site-wide stormwater management basin and outfall was completely destroyed.
The installation of a 15-foot rock revetment (one foot above the 100-year floodplain elevation) constructed with four-foot diameter boulders;
The replacement of a failed elevated timber walkway with a concrete slab-on-grade walkway, restoring portions of the existing bulkhead, clearing invasive plants, and the complete restoration of the failed stormwater basin and outlet; and
The development of natural barriers to reduce the impacts of storm surges and protect the coastal community, including planting stabilizing coastal vegetation to prevent erosion and installing fencing along the dune to facilitate natural dune growth.
During the final walkthrough earlier this month, the Princeton Hydro team captured drone footage of the completed project site. Click below to watch the video:
For more images and background information on this project, check out the following photo gallery and read our original blog post from July 2018:
For more information about Princeton Hydro’s engineering services, go here.
The City of Linden, located 13 miles southwest of Manhattan in Union County, New Jersey, is a highly urbanized area with a complex mix of residential, commercial, and industrial land uses. Originally settled as farmland on broad marshes, the City has deep roots in industrial production that emerged in the 19th century, and its easily accessible location on the Arthur Kill tidal straight helped fuel this industrial development.
Now, the City of Linden, which is home to more than 40,000 people, is considered a transportation hub: it has three major highways running through it (the New Jersey Turnpike, Route 1, and Route 27); its rail station provides critical commuter and industry access; the Linden Municipal Airport is a gateway to the NY/NJ metropolitan area; and its access point on the Arthur Kill is used by shipping traffic to the Port Authority of NY and NJ.
Unfortunately, the industrial boom left a legacy of pollution in the city, so much, that the Tremley Point Alliance submited an official Envionmental Justice Petition to the state. In 2005, the New Jersey Environmental Task Force selected the community for the development of an Environmental Justice Action Plan and listed it as one of six environmental justice communites in New Jersey.
Like other communities in the Arthur Kill Watershed, Linden also suffers severe flooding from heavy rains and storms with one of the significant sources of flood water coming from stormwater runoff. Due to a high percentage of impervious cover from houses, roadways, and sidewalks, even small rain events generate a significant amount of stormwater runoff. Over time, these conditions have been exacerbated by the historic loss of coastal wetlands and outdated infrastructure. Nuisance flooding is especially problematic as runoff cannot drain from the area at a sufficient rate to prevent flooding during normal or elevated tidal conditions. Very simply, heavy rainfall is one factor contributing to recurring flooding.
In 2012, Hurricane Sandy caused wide-spread destruction throughout New Jersey and the entire eastern seaboard. The City of Linden was hard hit, and the City’s Tremley Point neighborhood was especially storm-ravaged. Tremley Point, a low-lying community of about 275 homes located at the headwaters of Marshes Creek and in the 100-year floodplain of the Rahway River, is regularly flooded during normal rain events. During Hurricane Sandy, local news outlets reported that a 15-foot tidal surge overtook Tremley Point homes, destroyed roads, and washed up hazardous material such as a 150-gallon diesel tank.
To help communities like Tremley Point recover, the New Jersey Department of Environmental Protection (NJDEP) launched the Blue Acres program under which NJDEP purchases homes from willing sellers at pre-Sandy market values, so residents in areas of repetitive and catastrophic flooding can rebuild their lives outside flood-prone areas. Structures are demolished and the properties are permanently preserved as open space for recreation or conservation purposes. The program began in 1995 and expanded with federal funding after Sandy. The goal of the Blue Acres Program is to dramatically reduce the risk of future catastrophic flood damage and to help families to move out of harm’s way.
As part of the NJDEP Blue Acres Program, Princeton Hydro, in collaboration with the City of Linden, Rutgers University, NJDEP, Phillips 66, National Fish and Wildlife Foundation, New Jersey Corporate Wetlands Restoration Partnership, and Enviroscapes, has undertaken one of the first ecological restoration projects within Blue Acres-acquired properties, which are located in the Tremley Point neighborhood. This project increases storm resiliency by reducing flooding and stormwater runoff by improving the ecological and floodplain function within the former residential properties acquired by the NJDEP Blue Acres Program.
The project includes the development and implementation of an on-the-ground green infrastructure-focused floodplain enhancement design involving the restoration of native coastal floodplain forest and meadow, as well as floodplain wetlands. The restored area provides natural buffering to storm surge and enhances floodplain functions to capture, infiltrate, store, and slow excess stormwater to reduce the risk of future flood damage. In addition, it restores natural habitat and provides public recreation access on NJDEP Blue Acres property.
The design includes re-planting the parcels and the installation of a walking path through part of the area. It also includes the creation of a floodplain bench for the adjacent drainage ditch, an unnamed tributary to Marshes Creek. A floodplain bench is a low-lying area adjacent to a stream or river constructed to allow for regular flooding in these areas. Site improvements include grading of the floodplain bench and minor depressional area; 6-12-inches of tilling, soil amendment, and planting within the planting area; and construction of the gravel pathway.
The project will result in valuable environmental and community benefits to the area, including an annual reduction in stormwater runoff of 4.1 million gallons. This represents a 45% reduction in stormwater runoff. Restoration of the floodplain will also help reduce community vulnerability to storms. The hope is that this project will be a model that fosters more floodplain restoration projects in the future.
For more information on the Blue Acres Program, please visit the DEP website.
Walking through a park isn’t always a walk in the park when it comes to conducting stormwater inspections. Our team routinely spots issues in need of attention when inspecting stormwater infrastructure; that’s why inspections are so important.
Princeton Hydro has been conducting stormwater infrastructure inspections for a variety of municipalities in the Mid-Atlantic region for a decade, including the City of Philadelphia. We are in our seventh year of inspections and assessments of stormwater management practices (SMPs) for the Philadelphia Water Department. These SMPs are constructed on both public and private properties throughout the city and our inspections focus on areas served by combined sewers.
Our water resource engineers are responsible for construction oversight, erosion and sediment control, stormwater facilities maintenance inspections, and overall inspection of various types of stormwater infrastructure installation (also known as “Best Management Practices” or BMPs).
Our knowledgeable team members inspect various sites regularly, and for some municipalities, we perform inspections on a weekly basis. Here’s a glimpse into what a day of stormwater inspection looks like:
The inspector starts by making sure they have all their necessary safety equipment and protection. For the purposes of a simple stormwater inspection the Personal Protection Equipment (PPE) required includes a neon safety vest, hard hat, eye protection, long pants, and boots. Depending on the type of inspection, our team may also have to add additional safety gear such as work gloves or ear plugs. It is recommended that inspectors hold CPR/First Aid and OSHA 10 Hour Construction Safety training certificates.
Once they have their gear, our inspection team heads to the site and makes contact with the site superintendent. It’s important to let the superintendent know they’re there so that 1) they aren’t wondering why a random person is perusing their construction site, and 2) in case of an emergency, the superintendent needs to be aware of every person present on the site.
Once they arrive, our team starts by walking the perimeter of the inspection site, making sure that no sediment is leaving the project area. The team is well-versed in the standards of agencies such as the Pennsylvania Department of Environmental Protection, the Pennsylvania Department of Transportation, the New Jersey Department of Environmental Protection, and local County Soil Conservation Districts, among others. These standards and regulations dictate which practices are and are not compliant on the construction site.
After walking the perimeter, the inspection team moves inward, taking notes and photos throughout the walk. They take a detailed look at the infrastructure that has been installed since the last time they inspected, making sure it was correctly installed according to the engineering plans (also called site plans or drainage and utility plans). They also check to see how many inlets were built, how many feet of stormwater pipe were installed, etc.
If something doesn’t look quite right or needs amending, our staff makes recommendations to the municipality regarding BMPs/SMPs and provides suggestions for implementation.
One example of an issue spotted at one of the sites was a stormwater inlet consistently being inundated by sediment. The inlet is directly connected o the subsurface infiltration basin. When sediment falls through the inlet, it goes into the subsurface infiltration bed, which percolates directly into the groundwater. This sediment is extremely difficult to clean out of the subsurface bed, and once it is in the bed, it breaks down and becomes silt, hindering the function of the stormwater basin.
To remedy this issue, our inspection team suggested they install stone around the perimeter of the inlet on three sides. Although this wasn’t in the original plan, the stones will help to catch sediment before entering the inlet, greatly reducing the threat of basin failure.
Once they’ve thoroughly inspected the site, our team debriefs the site superintendent with their findings. They inform the municipality of any issues they found, any inconsistencies with the construction plans, and recommendations on how to alleviate problems. The inspector will also prepare a Daily Field Report, summarizing the findings of the day, supplemented with photos.
In order to conduct these inspections, one must have a keen eye and extensive stormwater background knowledge. Not only do they need to know and understand the engineering behind these infrastructure implementations, they need to also be intimately familiar with the laws and regulations governing them. Without these routine inspections, mistakes in the construction and maintenance of essential stormwater infrastructure would go unnoticed. Even the smallest overlook can have dangerous effects, which is why our inspections team works diligently to make sure that will not happen.
Our team conducts inspections for municipalities and private entities throughout the Northeast. Click here to read about a stormwater utility investigation and feasibility study we completed in the Town of Hammonton, New Jersey.
Along the Third River and Spring Brook, two freshwater tributaries of the Passaic River, a disturbed industrial site is being transformed into 4.2 acres of wetlands, restoring the natural floodplain connection, enhancing aquatic habitat, and increasing flood storage capacity for urban stormwater runoff. The groundbreaking ceremony for this important ecological restoration project for Bloomfield Township took place last month.
"The Third River Floodplain Wetland Enhancement Project is a unique, creative solution that will transform a highly-disturbed, flood-prone, former industrial site into a thriving public park allowing for both passive and active recreational activities,” said Mark Gallagher, Vice President of Princeton Hydro. “By removing a little over four acres of upland historic fill in this densely developed area and converting it to a functioning floodplain wetland, the project will restore valuable ecological functions, increase flood storage capacity, and enhance wildlife habitat."
Princeton Hydro is serving as the ecological engineer to Bloomfield Township for the Third River Floodplain Wetland Enhancement Project. Princeton Hydro’s scientists and engineers have assisted in obtaining grants, collected background ecological data through field sampling and surveying, created a water budget, completed all necessary permitting, and designed both the conceptual and final restoration plans. Additionally, Princeton Hydro will be conducting construction oversight during the implementation of this important urban wetland creation project.
The site includes 1,360 feet along the east bank of the Third River and 3,040 feet along the banks of the Spring Brook. These waterways are freshwater tributaries of the Passaic River and share a history of flooding above the site’s 100-year flood plain. The Third River, like many urban streams, tends to be the victim of excessive volume and is subjected to erosion and chronic, uncontrolled flooding. This green infrastructure project will re-establish the natural floodplain wetland and riparian plant communities, which will lead to a species-rich forest community through the removal of invasive species, setting the stage for native plants.
“Over 500 trees and shrubs will be planted in the new wetland with additional trees and shrubs being planted along Lion Gate Drive and in existing woodlands. The selected native plant species all provide important wildlife value such as providing fruit for migratory birds,” Gallagher explained. “We are excited to work with Bloomfield Township to design an urban restoration project that will both enhance the site’s ecological and flood storage value and provide accessibility to the community of Bloomfield.”
It is estimated that Phase One of the project, which includes the wetland construction and plantings, will be completed by September 1, 2019. The maintenance building, concession stand, ball field, etc., will be constructed as part of Phase Two.
“We are very excited to break ground on this exciting project that will have tremendous public benefits, like providing much-needed open space and lowering flood insurance rates for nearby residents and businesses,” said Bloomfield Township Mayor Michael Venezia. “By taking an underutilized parcel of land and turning it into beautiful park and waterfront space to be enjoyed by the public, we are fulfilling our commitment to preserving and enhancing open space. We would not have accomplished this without the efforts of Councilman Nick Joanow, who has advocated for this park for many years, Township Administrator Matthew Watkins, our excellent contractors and environmental experts, and I would like to thank them all. I also want to thank the Department of Environmental Protection and Freshwater Wetlands Mitigation Council for their important grant assistance to help us jump start this complex which will enrich the lives of Bloomfield residents for decades to come.”
NY/NJ Baykeeper has been vital in bringing the project to fruition, having served as an advocate for the project for the last 17 years.
"Lion's Gate natural restoration is a legitimate all-in-one project that uses green infrastructure and smart planning to address the nested set of urban land use challenges, including: stormwater management, flooding, brownfield cleanup, natural habitat restoration, and the need for both more active playing fields and more passive greenfields," said Greg Remaud, Baykeeper and CEO, NY/NJ Baykeeper.
Together, Bloomfield Township, Strauss and Associates, ARH, and Princeton Hydro secured $1.76 million in funding for this project from the New Jersey Freshwater Wetlands Mitigation Council and another several million dollars from NJDEP’s Office of Natural Resource Restoration.
This two-part blog series showcases our work in the Moodna Creek Watershed in order to explore common methodologies used to estimate flood risk, develop a flood management strategy, and reduce flooding.
As we laid out in Part One of this blog series, the Moodna Creek Watershed, which covers 180 square miles of eastern Orange County, New York, has seen population growth in recent years and has experienced significant flooding from extreme weather events like Hurricane Irene, Tropical Storm Lee, and Hurricane Sandy. Reports indicate that the Moodna Creek Watershed’s flood risk will likely increase as time passes.
Understanding the existing and anticipated conditions for flooding within a watershed is a critical step to reducing risk. Our analysis revealed that flood risk in the Lower Moodna is predominantly driven by high-velocity flows that cause erosion, scouring, and damage to in-stream structures. The second cause of risk is back-flooding due to naturally formed and man-made constrictions within the channel. Other factors that have influenced flood risk within the watershed, include development within the floodplain and poor stormwater management.
Now, let’s take a closer look at a few of the strategies that we recommended for the Lower Moodna Watershed to address these issues and reduce current and future flood risk:
Stormwater is the runoff or excess water caused by precipitation such as rainwater or snowmelt. In urban areas, it flows over sewer gates which often drain into a lake or river. In natural landscapes, plants absorb and utilize stormwater, with the excess draining into local waterways. In developed areas, like the Moodna Creek watershed, challenges arise from high volumes of uncontrolled stormwater runoff. The result is more water in streams and rivers in a shorter amount of time, producing higher peak flows and contributing to flooding issues.
Pollutant loading is also a major issue with uncontrolled stormwater runoff. Population growth and development are major contributors to the amount of pollutants in runoff as well as the volume and rate of runoff. Together, they can cause changes in hydrology and water quality that result in habitat loss, increased flooding, decreased aquatic biological diversity, and increased sedimentation and erosion.
To reduce flood hazards within the watershed, stormwater management is a primary focus and critical first step of the Moodna Creek Watershed Management Plan. The recommended stormwater improvement strategies include:
The project team recommended that stormwater management be required for all projects and that building regulations ensure development does not change the quantity, quality, or timing of run-off from any parcel within the watershed. Recommendations also stressed the importance of stormwater management ordinances focusing on future flood risk as well as addressing the existing flooding issues.
Floodplains are the low-lying areas of land where floodwater periodically spreads when a river or stream overtops its banks. The floodplain provides a valuable function by storing floodwaters, buffering the effect of peak runoff, lessening erosion, and capturing nutrient-laden sediment.
Communities, like the Moodna Creek watershed, can reduce flooding by rehabilitating water conveyance channels to slow down the flow, increasing floodplain storage in order to intercept rainwater closer to where it falls, and creating floodplain benches to store flood water conveyed in the channel. Increasing floodplain storage can be an approach that mimics and enhances the natural functions of the system.
One of the major causes of flooding along the Lower Moodna was the channel’s inability to maintain and hold high volumes of water caused by rain events. During a significant rain event, the Lower Moodna channel tends to swell, and water spills over its banks and into the community causing flooding. One way to resolve this issue is by changing the grading and increasing the size and depth of the floodplain in certain areas to safely store and infiltrate floodwater. The project team identified several additional opportunities to increase floodplain storage throughout the watershed.
One of the primary areas of opportunity was the Storm King Golf Club project site (above). The team analyzed the topography of the golf course to see if directing flow onto the greens would alter the extent and reach of the floodplain thus reducing the potential for flooding along the roadways and properties in the adjacent neighborhoods. Based on LiDAR data, it was estimated that the alteration of 27 acres could increase floodplain storage by 130.5 acre-feet, which is equivalent to approximately 42.5 million gallons per event.
For areas where land preservation is not a financially viable option, but the land is undeveloped, prone to flooding, and offers ecological value that would be impacted by development, the project team recommended a potential Critical Environmental Area (CEA) designation. A CEA designation does not protect land in perpetuity from development, but would trigger environmental reviews for proposed development under the NY State Quality Environmental Review Act. And, the designation provides an additional layer of scrutiny on projects to ensure they will not exacerbate flooding within the watershed or result in an unintentional increase in risk to existing properties and infrastructure.
Conserved riparian areas also generate a range of ecosystem services, in addition to the hazard mitigation benefits they provide. Protected forests, wetlands, and grasslands along rivers and streams can improve water quality, provide habitat to many species, and offer a wide range of recreational opportunities. Given the co-benefits that protected lands provide, there is growing interest in floodplain conservation as a flood damage reduction strategy.
These are just a few of the flood risk reduction strategies we recommended for the Lower Moodna Creek watershed. For a more in-depth look at the proposed flood mitigation strategies and techniques, download a free copy of our Moodna Creek Watershed and Flood Mitigation Assessment presentation.
Revisit part-one of this blog series, which explores some of the concepts and methods used to estimate flood risk for existing conditions in the year 2050 and develop a flood management strategy.
Located in Queens, New York on the northern shore of Jamaica Bay, Spring Creek South contains approximately 237 acres of undeveloped land, including wetlands and 2.4 miles of coastline. The site is bounded by the Howard Beach residential neighborhood in Queens, a commercial area along Cross Bay Boulevard, the Belt Parkway, and Jamaica Bay. The northwest section of Spring Creek South is part of the National Park Service’s Gateway National Recreation Area, and is largely comprised of small patches of degraded tidal marsh and disturbed and degraded upland ecosystems.
On October 29, 2012, Hurricane Sandy drove a catastrophic storm surge into the New Jersey and New York coastlines. Spring Creek South and the surrounding community of Howard Beach experienced record flooding and damage to property and critical infrastructure. Storm tides caused damage and erosion along the shoreline and in the salt marsh area, degrading important habitat and leaving the site vulnerable to invasive species.
The New York State Division of Homeland Security and Emergency Services (NYSDHSES) was awarded funding from FEMA’s Hazard Mitigation Grant Program to restore Spring Creek South. The U.S. Army Corps of Engineers (USACE) New York District, serving as project administrator, contracted Princeton Hydro to provide ecosystem restoration services. The goal of the project is to reduce future flood risk exposure while also protecting, restoring, and improving the quality and function of ecological systems; improving stormwater management and water quality; and enhancing the park’s visitor experience.
To achieve this goal, the project team is using an integrated approach that involves utilizing green infrastructure to create a natural barrier for the community and reduce the risks of coastal storms. Project activities include berm construction and the restoration of tidal marsh, creation of freshwater wetland forest, and creation of maritime shrub, forest, and grassland habitats, as well as stabilization of the existing shoreline.
On December 31, 2018, we completed Phase One of the project, which entails engineering design and preliminary permitting. More specifically, we’ve provided conceptual planning; analysis of subsurface soils for geotechnical properties and hazardous waste; coastal and freshwater wetland delineations; biological benchmarking analysis; and the development of sea level rise curves and two-dimensional hydrologic and hydraulic coastal modeling. As part of the hydrology study, we analyzed what the site could be expected to look like in 50 years due to climate changes and sea level rise. Our engineering design was also brought to 65% completion.
We also obtained permits, prepared the Environmental Assessment (EA), and oversaw the National Environmental Policy Act (NEPA) process. The EA received a "Finding of No Significant Impact" (FONSI) from FEMA, which means the environmental analysis and interagency review concluded that the project has no significant impacts on the quality of the environment.
Due to the complex nature of this project and its location, we are coordinating with a variety of different entities, including the local Howard Beach Community Board, the FAA (proximity to JFK International Airport), Port Authority, USACE, NOAA Fisheries, USFWS, USEPA, NYSDEC, NYC DEP, the National Park Service, HDR Engineering and WSP Engineering.
Phase Two of the project is the construction phase, which is expected to take about two years to complete. A key part of the Spring Creek South construction activities is the restoration of approximately 40 acres of tidal marsh, which is anticipated to improve water quality locally by stabilizing sediment, reducing erosion, and filtering dissolved particulate materials. The project team will restore existing coastline areas and install a salt marsh along the shoreline. Planted with native flora, like Spartina alterniflora, a perennial deciduous grass found in intertidal wetlands, the coastal salt marsh will help to stabilize sediment. Additionally, removing invasive species like Phragmites australis from the area and replacing it with native plant species will increase the ability for native vegetation to colonize the site, improve vegetative diversity, and reduce fire risk in the park.
A forested wetland area and berm will also be created in order to provide the surrounding communities with natural shields and buffers to future storms. The berm, with an elevation of 19 feet (NAVD88), will help to manage the risk of storm surge flooding caused by coastal storms. The forested wetland area will also provide improved stormwater runoff storage, naturally filter stormwater, and, via flap gates, direct its flow toward Jamaica Bay, away from residential and commercial properties.
These measures will help to dissipate wind and wave energy, increase shoreline resilience, improve stormwater management at the site, and create habitat that increases the ecological value and biodiversity at the site, while providing resilience benefits. Restoration activities will benefit vulnerable and rare ecological communities by producing localized environmental enhancements, including improving water quality and creating and restoring habitat. The project also increases opportunities for recreational uses such as wildlife viewing/photography, fishing, and nature study.
Princeton Hydro specializes in the planning, design, permitting, implementing, and maintenance of wetland rehabilitation projects. To learn more about some of our ecosystem restoration and enhancement services, visit: bit.ly/PHwetland.
...
People generally think of green infrastructure as an eco-friendly way to handle stormwater runoff. While many green infrastructure elements are planned and managed specifically for stormwater control, the capabilities and benefits are far reaching. In this piece, we’ll provide an in-depth look at all that green infrastructure encompasses, best practices, and real-world examples of green infrastructure projects in action.
Defined as an approach to water management that protects, restores, or mimics the natural water cycle, green infrastructure can be implemented for large scale projects and small scale projects alike.
Unlike conventional, or “gray” infrastructure, green infrastructure uses vegetation, soil, and other natural components to manage stormwater and generate healthier urban environments. Green infrastructure systems mimic natural hydrology to take advantage of interception, evapotranspiration and infiltration of stormwater runoff at its source. Examples include permeable pavers, rain gardens, bioretention basins, rain barrels, and tree boxes.
Green infrastructure provides various benefits, including cleaning and conserving water, reducing flooding, improving public health, providing jobs, beautifying neighborhoods, supporting wildlife and providing economic benefits at both the larger community and individual household level. Let’s take a closer look at some of the primary benefits:
Prevents Flooding: By absorbing and slowing the flow of water, green infrastructure can reduce the burden on storm sewer systems and mitigate localized flooding.
Saves Money: While some green infrastructure designs may require the same or greater initial investment than conventional strategies, green design methods provide a big return in reducing costs over the long-term.
Improves Water Quality: Through natural absorption and filtration processes, green infrastructure significantly reduces stormwater runoff volume, decreases the pollutants and particulates within the stormwater, and improves the quality of the runoff flowing into surrounding water bodies.
Improves Air Quality: Green infrastructure techniques like tree boxes, green roofs and vegetative barriers have long been associated with improving air quality. Urban tree boxes help shade surfaces, effectively putting moisture into the air while reducing greenhouse gases. Trees mitigate heat and air pollution, both cooling and cleaning the air.
Enhances Aesthetics: Many green infrastructure practices utilize native plants and trees to improve runoff absorption and reduce stormwater pollution. This vegetation can provide a sound barrier or privacy screen for properties, and enhances the overall aesthetics of the surrounding environment.
Increases Property Values: Research shows that property values increase when trees and other vegetation are present in urban areas. Planting trees can increase property values by as much as 15%.
With the use of proper design techniques, green infrastructure can be applied almost anywhere and is especially beneficial in urban areas. In developed environments, unmanaged stormwater creates two major issues: one related to the volume and timing of stormwater runoff (flooding) and the other related to pollutants the water carries. Green Infrastructure in urban environments can recharge groundwater, decrease runoff, improve water quality, and restore aquatic habitats while controlling flooding.
Across the United States, more than 700 cities utilize combined sewer systems (CSS) to collect and convey both sanitary sewage and stormwater to wastewater treatment facilities. During dry weather, all wastewater flows are conveyed to a sewage treatment plant where it receives appropriate treatment before it is discharged to the waterway. However, during heavy rainfall or significant snowmelt, the additional flow exceeds the capacity of the system resulting in a discharge of untreated sewage and stormwater to the waterway; this discharge is referred to as a combined sewer overflow (CSOs). For many cities with CSS, CSOs remain one of the greatest challenges to meeting water quality standards. Green infrastructure practices mimic natural hydrologic processes to reduce the quantity and/or rate of stormwater flows into the CSS.
New Jersey, as part of the 2012 USEPA’s Integrated Municipal Stormwater and Wastewater Planning Approach Framework, utilized green infrastructure as one of the main components in managing its CSS and reducing CSOs. Because of the flexibility of green infrastructure in design performance, it can reduce and mitigate localized flooding and sewer back-ups while also reducing CSOs. An integrated plan that addresses both overflows and flooding can often be more cost-effective than addressing these issues separately. New Jersey, in addition to meeting its CSO reduction goals, is using green infrastructure throughout the sewershed to build resilience to large storm events and improve stormwater management.
Philadelphia takes advantage of numerous green stormwater infrastructure programs such as Green Streets, Green Schools, and Green Parking. There are a wide variety of green infrastructure practices that Philadelphia is using to decrease stormwater runoff throughout the entire city. After just five years of implementing the Green City, Green Waterplan, Philadelphia has reduced the stormwater pollution entering its waterways by 85%. Using over 1,100 green stormwater tools (i.e. CSO, living landscapes, permeable surfaces, etc.), in just one year, Philadelphia was able to prevent over 1.7 billion gallons of polluted water from entering their rivers and streams.
New York City is using a green infrastructure program, led by its Department of Environmental Protection, that utilizes multiple green infrastructure practices to promote the natural movement of water while preventing polluted stormwater runoff from entering sewer systems and surrounding waterbodies. While attaining this goal, the green infrastructure also provides improvements in water and air quality, as well as improves the aesthetics of the streets and neighborhoods. According to the NYC Green Infrastructure Plan, “By 2030, we estimate that New Yorkers will receive between $139 million and $418 million in additional benefits such as reduced energy bills, increased property values, and improved health.”
Green infrastructure techniques are extremely beneficial on every scale. Residential homes and neighborhoods can benefit from the implementation of green infrastructure in more ways than many people realize. There are a wide variety of green infrastructure projects that can be completed with a relatively small time and financial investment. Many of us at Princeton Hydro have incorporated green infrastructure practices into our homes and properties. Here’s a look at some of those projects in action:
Dr. Steve Souza, a founding principal of Princeton Hydro, installed rain gardens throughout his property utilizing native, drought-resistant, pollinator-attracting plants. The rain gardens are designed to capture and infiltrate rainwater runoff from the roof, driveway, patio and lawn.
Princeton Hydro's President Geoffrey Goll, P.E. built an infiltration trench in his backyard. An infiltration trench is a type of best management practice (BMP) that is used to manage stormwater runoff, prevent flooding and downstream erosion, and improve water quality in adjacent waterways.
Since its inception, Princeton Hydro has been a leader in innovative, cost-effective, and environmentally sound stormwater management systems. Long before the term “green infrastructure” was part of the design community’s lexicon, the firm’s engineers were integrating stormwater management with natural systems to fulfill such diverse objectives as flood control, water quality protection, and pollutant reduction. Princeton Hydro has developed regional nonpoint source pollutant budgets for over 100 waterways. The preparation of stormwater management plans and design of stormwater management systems for pollutant reduction is an integral part of many of the firm’s projects.
Interested in working with us on your next Green Infrastructure project? Contact us here.
…
Tucker is a Civil and Environmental Engineering major at Rowan University focusing on Water Resources Engineering. He is the President and player of the Rowan University Men's DII Ice Hockey Team. His Junior Clinic experience includes the study of Bio-Cemented sand and the Remote Sensing of Landfill Fires. In the future, Tucker hopes to work on creating a more sustainable environment. Tucker enjoys playing ice hockey, being with friends and family, and exercising.
Clay’s areas of expertise include hydrologic and hydraulic analysis, stormwater management and infiltration, nonpoint source (NPS) pollution, watershed modeling, groundwater hydrology/modeling, and water quality and quantity monitoring at both the individual site and watershed scales. His educational and work experience includes a substantial amount of crossover between engineering and environmental science applications. He has specific expertise in the field of stormwater infiltration and has conducted extensive research on the NPS pollution control and water quantity control performance of stormwater BMPs. He regularly disseminates his monitoring results through numerous peer-reviewed journal publications, magazine articles, and presentations.
In this two part blog series, we showcase our work in the Moodna Creek Watershed in order to explore some of the concepts and methods used to estimate flood risk for existing conditions and the year 2050 and develop a flood management strategy (Part One), and traditional engineering and natural systems solutions used to manage and reduce flood risk (Part Two).
The greater Moodna Creek watershed covers 180 square miles of eastern Orange County, NY. The watershed includes 22 municipalities and hundreds of streams before joining the Hudson River. This region has seen tremendous growth in recent years with the expansion of regional transit networks and critical infrastructure.
The Moodna Creek watershed can be split into two sub-basins — the Upper Moodna Creek and the Lower Moodna Creek. In the span of 15 months, Hurricane Irene, Tropical Storm Lee, and Hurricane Sandy each have caused significant flooding throughout the Moodna Creek watershed, damaging public facilities, roadways, and private properties. Both sub-basin communities have noted a concern about increased flood risk as more development occurs.
As global temperatures rise, climate models are predicting more intense rainfall events. And, the flood risk for communities along waterways — like the Moodna Creek watershed — will likely increase as time passes. In order to understand existing and future risk from flood events in this flood-prone area, a flood risk management strategy needed to be developed. The strategy uses a cost-benefit analysis to review the feasibility of each measure and the overall impact in reducing flood risks.
With funds provided from a 2016 grant program sponsored by the New England Interstate Waters Pollution Control Commission (NEIWPCC) and the New York State Department of Environmental Conservation's (NYCDEC) Hudson River Estuary Program (HEP), Princeton Hydro along with a variety of project partners completed a flood assessment and flood mitigation analysis specific to the Lower Moodna Creek watershed.
Let’s take a closer look at our work with the Lower Moodna Creek watershed, and explore some of the methods used to estimate flood risk and develop a flood management strategy:
The primary Lower Moodna Creek project goals were to assess flood vulnerabilities and propose flood mitigation solutions that consider both traditional engineering strategies and natural systems solution approaches (land preservation, wetland/forest restoration, green infrastructure and green water management). The project team focused on ways to use the natural environment to reduce risk. Instead of strictly focusing on just Moonda Creek, the team took a holistic approach which included all areas that drain into the river too. These analyses were incorporated into a Flood Assessment Master Plan and Flood Mitigation Plan, which will serve as a road map to reducing flooding issues within the watershed.
The first step in managing flood risk is to understand what type of exposure the communities face. The Moodna Creek project modeled flooding within the watershed during normal rain events, extreme rain events, and future rain events with two primary goals in mind:
The project team used these models and data to propose and evaluate a series of design measures that help reduce and mitigate existing and anticipated flood risk within the study area. Where possible, the proposed solutions prioritized approaches that protect and/or mirror natural flood protection mechanisms within the watershed such as floodplain re-connection and wetland establishment. In addition to flood protection, the project components also provide water quality protection, aesthetics and recreation, pollutant reduction, and wildlife habitat creation.
Zoning is a powerful tool that determines a region’s exposure to hazards and risk. Zoning determines which uses are permitted, or encouraged, to be built in moderate and high-risk areas. It also prevents certain uses, such as critical facilities, from being built in those areas. Zoning is also a determinant of a region’s character and identity.
In the Lower Moodna Creek watershed, a large majority (82%) of land is zoned for residential use. However, in the flood-prone areas, there is a higher ratio of areas zoned for non-residential uses (commercial, industrial) than in areas that are zoned for potential future development. Specifically, within the 10-year storm recurrence floodplain, 30% of the land is zoned for industrial use. This is likely because several facilities, such as wastewater treatment plants and mills, require access to the river and were strategically developed to be within immediate proximity of waterfront access. The Lower Moodna zoning analysis demonstrated a general preference within watershed to limit residential use of flood-prone areas.
Preserving land allows for natural stormwater management, as well as limits the exposure of development, and minimizes sources of erosion within the watershed. Preserved land also maintains the hydrologic and ecologic function of the land by allowing rainwater to be absorbed or retained where it falls and thus minimizing run-off. If the land within the floodplain is preserved, it will never be developed, and therefore the risk — a calculation of rate exposure and the value of the potential damage — is eliminated. Therefore, land preservation, both within the floodplains and in upland areas, is the best way to minimize flood damage.
Conserved riparian areas also generate a range of ecosystem services, in addition to the hazard mitigation benefits they provide. Protected forests, grasslands, and wetlands along rivers and streams can improve water quality, provide habitat to many species, and offer a wide range of recreational opportunities. Given the co-benefits that protected lands provide, there is growing interest in floodplain conservation as a flood damage reduction strategy.
Within the mapped Lower Moodna floodplains, our assessment determined that there appears to be a slight priority for preserving land most at-risk for flooding. This is likely a consequence of prioritizing land that is closest to riparian areas and preserving wetland areas, which are the most likely to experience flooding. Within the floodplains for the 10-year storm, approximately 22.7% is preserved. For the 100-year storm, approximately 21.2% of the land is preserved. Within the 500-year storm, this number drops slightly to 20.3%. These numbers are so close in part because the difference between the 10-year, 100-year, and 500-year floodplains are small in many areas of the watershed.
Hydrology is the scientific study of the waters of the earth, with a particular focus on how rainfall and evaporation affect the flow of water in streams and storm drains. Hydraulics is the engineering analysis of the flow of water in channels, pipelines, and other hydraulic structures. Hydrology and hydraulics analyses are a key part of flood management.
As part of this flood assessment, Princeton Hydro created a series of hydrologic and hydraulic (H&H) models to assess the extent of potential flooding from the 10-year, 100-year, and 500-year storm recurrence intervals within the Lower Moodna. The modeling, which included flows for these storm events under existing conditions and future conditions based on predicted increases in precipitation and population growth, makes it easier to assess what new areas are most impacted in the future.
These are just a few of the assessments we conducted to analyze the ways in which flooding within the watershed may be affected by changes in land use, precipitation, and mitigation efforts. The flood models we developed informed our recommendations and proposed flood mitigation solutions for reducing and mitigating existing and anticipated flood risk.
Check out Part Two of this blog series in which we explore flood risk-reduction strategies that include both traditional engineering and natural systems solutions:
For more information about Princeton Hydro's flood management services, go here.
As dams age and decay, they can become public safety hazards, presenting a failure risk and flooding danger. According to American Rivers, “more than 90,000 dams in the country are no longer serving the purpose that they were built to provide decades or centuries ago.” Dam removal has increasingly become the best option for property owners who can no longer afford the rising cost of maintenance and repair work required to maintain these complex structures.
Dams can also cause environmental issues such as blocking the movement of fish and other aquatic species, inundating river habitat, impairing water quality, and altering the flow necessary to sustain river life. Removing nonfunctional, outdated dams can bring a river back to its natural state and significantly increase biodiversity for the surrounding watershed.
Currently, work is underway in Watertown, Connecticut to remove the Heminway Pond Dam, which restricts fish passage in Steele Brook, creates a pond with increased water temperatures and high bacterial levels due to high geese populations, and encourages deposition of iron precipitate in the stream channel just downstream of the dam.
Princeton Hydro designed the engineering plans, managed permitting and is now overseeing construction for the removal project. The removal of the Heminway Pond Dam is identified as an integral component in addressing water quality impairment between the dam and Echo Lake Road.
REMOVAL OF HEMINWAY POND DAM ON STEELE BROOK IN WATERTOWN UNDERWAY After almost 15 years of discussion and planning with the Town of Watertown and other partners, removal of Heminway Pond Dam on Steele Brook in Watertown finally got underway in early July. Though no longer functional, the dam and pond were originally constructed to supply water for a former thread/string mill. The Town acquired the dam and pond from the Siemon Company, the most recent owner, in 2007 with an eye towards removing the dam, restoring the river and converting the dewatered impoundment area into a passive recreation area, including an extension of the Steele Brook Greenway. With these goals in mind, the Town approached CT DEEP for help with removal of the dam. As it turns out, CT DEEP, has also had a strong interest in seeing this dam removed. It is anticipated that dam removal will improve the hydrology in this section of Steele Brook and eliminate a water quality impairment which manifests itself during hot weather and low flow conditions, as an orange-colored plume of water (due to iron precipitate) immediately downstream of the dam that impacts aquatic life. Dam removal would also benefit fisheries by restoring stream connectivity and habitat. Working towards these mutual goals, CT DEEP was able to provide federal CWA 319 nonpoint source grant funding to USDA NRCS to develop a watershed-based plan for Steele Brook to address nonpoint source impairments that includes a dam removal feasibility analysis for Heminway Pond Dam. Based on the recommendations in this plan, CT DEEP subsequently provided additional 319 grant funds to the Town of Watertown to hire a consultant to develop a dam removal design package, and assist with permitting and preparation. With the Town of Watertown as a strong and vested partner, CT DEEP is now helping this project over the finish line by providing a combination of 319 and SEP funds to accomplish the actual dam removal and restoration of Steele Brook. Dayton Construction Company is performing the construction and Princeton Hydro is the consultant overseeing the project on behalf of the Town. The Northwest Conservation District is also assisting with the project. It is anticipated that the majority of the work will be completed by this Fall. U.S. EPA, ACOE and CT DEEP have all played active roles with regard to permitting the project.
After almost 15 years of discussion and planning with the Town of Watertown and other partners, removal of Heminway Pond Dam on Steele Brook in Watertown finally got underway in early July. Though no longer functional, the dam and pond were originally constructed to supply water for a former thread/string mill. The Town acquired the dam and pond from the Siemon Company, the most recent owner, in 2007 with an eye towards removing the dam, restoring the river and converting the dewatered impoundment area into a passive recreation area, including an extension of the Steele Brook Greenway. With these goals in mind, the Town approached CT DEEP for help with removal of the dam.
As it turns out, CT DEEP, has also had a strong interest in seeing this dam removed. It is anticipated that dam removal will improve the hydrology in this section of Steele Brook and eliminate a water quality impairment which manifests itself during hot weather and low flow conditions, as an orange-colored plume of water (due to iron precipitate) immediately downstream of the dam that impacts aquatic life. Dam removal would also benefit fisheries by restoring stream connectivity and habitat.
Working towards these mutual goals, CT DEEP was able to provide federal CWA 319 nonpoint source grant funding to USDA NRCS to develop a watershed-based plan for Steele Brook to address nonpoint source impairments that includes a dam removal feasibility analysis for Heminway Pond Dam. Based on the recommendations in this plan, CT DEEP subsequently provided additional 319 grant funds to the Town of Watertown to hire a consultant to develop a dam removal design package, and assist with permitting and preparation.
With the Town of Watertown as a strong and vested partner, CT DEEP is now helping this project over the finish line by providing a combination of 319 and SEP funds to accomplish the actual dam removal and restoration of Steele Brook. Dayton Construction Company is performing the construction and Princeton Hydro is the consultant overseeing the project on behalf of the Town. The Northwest Conservation District is also assisting with the project. It is anticipated that the majority of the work will be completed by this Fall. U.S. EPA, ACOE and CT DEEP have all played active roles with regard to permitting the project.
Princeton Hydro has designed, permitted, and overseen the reconstruction, repair, and removal of dozens of small and large dams in the Northeast. Click here to read about a recent dam removal project the firm completed on the Moosup River.
Hurricane Sandy was the largest storm to ever originate in the Atlantic ocean. It badly damaged several countries in the Caribbean, caused over $50 billion in damages along the Eastern Seaboard, and left dozens dead. While hurricanes are a natural part of our climate system, research shows that intense hurricane activity has been on the rise in the North Atlantic since the 1970s. This trend is likely to be exacerbated by sea level rise and growing populations along coastlines. Natural coastal habitats — like wetlands and dunes — have proven to shield people from storms and sea-level rise, and have protected coastal communities from hundreds of millions of dollars in damage.
The Dunes at Shoal Harbor, a residential community in Monmouth County, New Jersey, is situated adjacent to both the Raritan Bay and the New York City Ferry channel. The site, previously utilized for industrial purposes, consisted of a partially demolished docking/berthing facility. A significantly undersized 6” diameter, 8-foot long stone revetment was also constructed on the property.
During Hurricane Sandy, the revetment failed and the community was subjected to direct wave attack and flooding. Homes were damaged, beach access was impaired, and the existing site-wide stormwater management basin and outfall was completely destroyed.
Princeton Hydro performed a wave attack analysis commensurate with a category three hurricane event, and used that data to complete a site design for shoreline protection. Consistent with the analysis, the site design includes the installation of a 15-foot rock revetment (one foot above the 100-year floodplain elevation) constructed with four-foot diameter boulders. The project also consists of replacing a failed elevated timber walkway with a concrete slab-on-grade walkway, restoring portions of the existing bulkhead, clearing invasive plants, and the complete restoration of the failed stormwater basin and outlet.
The plan incorporates natural barriers to reduce the impacts of storm surges and protect the coastal community, including planting stabilizing coastal vegetation to prevent erosion and installing fencing along the dune to facilitate natural dune growth.
These measures will discourage future erosion of the shoreline, protect the residential community from future wave attacks and flooding, and create a stable habitat for native and migratory species. The project is currently in the permitting phase, and will move to construction when all permits are obtained from local, state, and federal agencies.
This project is an great example of Princeton Hydro's ability to coordinate multi-disciplinary projects in-house. Our Water Resources Engineering, Geosciences Engineering, and Natural Resources teams have collaborated efficiently to analyze, design, and permit this shoreline protection project. For more information on our engineering services, go here.
Your Full Name * Phone Number * Your Email * Organization Address Message *
By EmailBy Phone
Submit
Δ
Couldn’t find a match? Check back often as we post new positions throughout the year.